My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
25H - AGMT - ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:56:39 AM
Creation date
8/1/2013 10:03:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and ADA upgrades, new play equipment and site furnishings were added, landscaping was restored and enhanced, <br />and the park's existing irrigation system was reconfigured and rehabilitated. <br />1.4 References <br />The staff members proposed for this court act have excellent references. We encourage the City to contact the <br />references to get a first hand account of the quality of service URS provides. <br />2.0 Work Plan <br />URS has enjoyed an excellent working relationship with the City and its staff through our prior contracts, including <br />the on-call engineering and landscaping services contract. Through these projects, we have become thoroughly familiar <br />with the City's design and construction specifications and procedures. As such, our work plans are written to be in line <br />with the City's expectations and are based on our considerable engineering experience. This section outlines the steps <br />and progression of tasks anticipated for a typical public works improvement project. This typical work plan would be <br />modified and tailored to each specific assignment. <br />2.1 Management Plan <br />The first task for any assignment is the development of a project-specific management plan. The management plan <br />consists of a specific scope of work, a detailed project schedule and budget, and a quality control plan. With a solid <br />scope and schedule, the project can be effectively controlled by maintaining the budget and completing the work on, <br />or prior to, required deadlines. Other features of the management plan include project design criteria and constraints; <br />project contact names, addresses, telephone numbers and email addresses; a uniform filing system for the project and <br />a copy of the contract. <br />2.2 Utility Company Research and Data Collection <br />Thorough data collection early in the project initiation stages saves valuable time <br />throughout the remaining design phases of the project. Typical reference <br />documents to be gathered might include as-built plans, previous studies by the <br />City or others, general plan information, standard plats, and design standards. <br />These are all utilized to lay the groundwork for the base sheets on which the <br />designs are completed. In addition, URS will contact utility agencies to obtain <br />their record drawings of any facilities within the project area. Existing utility <br />information obtained through the record search will be incorporated into the <br />plan as part of a base map developed in Microstation. <br />2.3 Field Survey/Topographic Mapping <br />Most projects require design surveys to fit the improvements into the existing conditions of a site. Again, up front field <br />surveys can save design time by providing accurate data on which to base geometric calculations and tie-in details at the <br />join points. To minimize toss, it is important to carefully plan what survey information is required to complete the <br />designs prior to sending the survey party into the field; this allows the survey party to focus their time on the critical <br />areas of the site. Any survey/mapping data will be in Microstation format to facilitate is use in the design of the <br />project. <br />25H-18
The URL can be used to link to this page
Your browser does not support the video tag.