Laserfiche WebLink
? Clinton Keith Road Widening Project, Riverside County, CA -This project is in progress and consists of <br />preparing the Project Report/Environmental Document (PA/ED) and the plans, PS&E to complete <br />construction of this Riverside County arterial street widening. Jeff is the project manager and is responsible <br />for the report development, including the Preliminary Engineering Report, drainage review, right-of, <br />way/utility review, geotechnical review, specifications and cost estimates. Work was performed for Riverside <br />County Transportation Department (RC,'TD). <br />? Mid Valley Parkway Improvements, Palm Desert, CA -Jeff was responsible for the development of PS&E <br />for this high-capacity arterial. This project included preparing final construction documents for the roadway <br />and grading improvements, existing channel lining improvements, and a detention basin. This project <br />proposed to construct a four-lane roadway (on a new alignment) extending Mesquite Avenue across the <br />Whitewater River and connecting to the existing Dinah Shore Drive dead end. <br />? PS&LE for improvement to various California facilities; Southwest Division Naval Facilities Engineering <br />Command, CA - Jeff was responsible for PS&E for improvements to military facilities at various locations. <br />The work included designs for drainage improvements using HEC12 design software, grading, earthwork, <br />pavement reconstruction, oil/water collection system, fire waterline and landfill concrete cap. All designs <br />conformed to Navy standards and guidelines. <br />Profeufonal Civil EnginesriCallfomis <br />BS/Civil FngiiteainglUnivereity of Washington, 11411111111 <br />Jeff Chapman has two decades of civil engineering and project management experience, particularly in the area of <br />public works improvements. In addition to being the project manager on the most recent on-call contract for the City, <br />Jeff's projects have included road and highway planning and design, site design, utility design, grading and drainage <br />and construction services for a wide variety of public works clients. Jeff has successfully managed multidisciplirtary <br />project teams with simultaneous schedules meeting all of his clients' needs. A "han&ore approach to project oversight <br />ensures that he maintains overall control of the entire project (technical quality, budget and schedule) and facilitates <br />open communication with City staff so the work follows a team consensusbuilding approach. The following presents <br />past relevant experience for Jeff: <br />? Edinger Avenue Reconstruction/Resurfacing, Santa Ana, CA - Project Manager responsible for preliminary <br />and final design documents for the rehabilitation of Edinger Avenue from Magnolia Avenue to Main Street. <br />Services included pavement analysis, geotechnical investigation and preparation of PS&E. Work included a <br />topographic survey, pavement teconstruction/resurfacing, replacement/installation of curbs, gutters, <br />sidewalks, driveways, wheel chair ramps and traffic detector loops. <br />? Cornerstone Village (Minnie/Standard Street) Improvements, Santa Ana, CA - Project Manager responsible <br />for preliminary and final design documents for street and parking lot improvements, landscaping, fencing and <br />lighting. Services included preliminary and final design for street and parking lot reconfiguration, landscaping, <br />pavement rehabilitation, signing, pavement markings, utility and drainage considerations and special <br />considerations of aesthetics. <br />? Xerox Centre, Santa Ana, CA - Project Engineer responsible for final engineering and site design for the 15- <br />story office building complex. The project included the design of Cabrillo Park Drive; improvements and <br />widening of First Street; installation of traffic signals; engineering and design of storm drain, water, and sewer <br />facilities; site grading; and retaining wall design. <br />? Edinger Avenue Landscaping Improvements, Santa Ana, CA - Project Engineer responsible for the <br />coordination of PS&Es for site design and landscaping improvements along Edinger Avenue between Bristol <br />Street and Broadway Street. Improvements included mounded grading, hardscaped medians, turf and pine <br />trees. The work was closely coordinated with City of Santa Ana staff to maintain consistency with surrounding <br />streetscapes. Water points of connection were determined from City as-builts and by inspection in the field. <br />The entire bid package was prepared to allow for the incorporation of a separate adjacent improvement <br />project. <br />25H-22