My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
25H - AGMT - ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:56:39 AM
Creation date
8/1/2013 10:03:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional CW41 Engineer/California <br />BS/Civil EngineerinWThe University of Malboune, Australia <br />Mr. Hynes has worked on a variety of civildesign projects including road design, hydrology studies; meteorological <br />studies; site planning and development and is trained in the use of MicroStation J, luroads/SelectC-AD, and water <br />resource engineering software including, WSPG-Water Surface Pressure Gradient Analysis Program, HEGRAS and <br />StormiCAD. <br />? SR-22 Design Build Project, Orange County, CA - Design Engineer for train drainage facilities for the <br />11.5-mile widening of SR-22 for OCTA. Major flood control drainage facilities affecting the freeway were <br />identified and correspondence with local flood control agencies with hydrology analysis and reports were <br />submitted. One major design completed was the Lewis Flood Channel, a 1.5-mile, 12-ft wide Reinforced <br />concrete box under the freeway. All design was completed with input from the contractor to minimize <br />construction costs during each design phase. Michael also provided oversight for the completion of the project <br />Storm Water Data Report. <br />? 1.5 Gateway PS&E, Buena Park, CA - Lead Design Engineer for the roadway layouts and drainage design for <br />a 2-mile, lNane freeway for OCTA. Tasks included horizontal and vertical design for the freeway, four ramps <br />and two local street overcrossings to Caltrans and ASHTO standards. Drainage design for these facilities, <br />including a hydrology analysis for a pump, was also completed. <br />Professional Civil EngineerfCstgornis <br />Professional Traffk Engineer/CalUomia <br />BSlCMI, Environmental EngineeringfUnivarsity of Rhode Island <br />Doug Smith has 24 years of experience in transportation and traffic engineering including numerous highway and <br />street improvement designs, ITS applications and traffic operations improvements, traffic impact analysis, parking <br />analysis, design of more than 150 traffic signal systems, and the preparation of site plans and parking layouts for <br />residential and commercial developments. He has also participated in the preparation of several conceptual design <br />reports for highway and street improvement projects. Doug has extensive experience in computer applications in traffic <br />and transportation engineering including Highway Capacity Manual Software and the use of TRANSYT 7F and <br />PASSER II for analysis and timing of traffic signal systems. He has also directed the use of impact analysis models in <br />the preparation of traffic impact studies. listed below are examples of past projects relevant to the scope of work <br />anticipated for Doug: <br />? Valley View Street Feasibility Study, Buena Park, CA - Doug prepared the traffic analysis for arterial and <br />intersection improvement plan along this critical City route including SYNCHRO signal timing analysis <br />? City of Irvine, Irvine, CA - Project Manager of tasks for the Irvine TMSOS, which included concept design <br />of TMS elements, assistance in preparation of a concept design report, PS&E of CMS locations and <br />preparation of a Signal Coordination Policies and Practices Report. <br />? City of Santa Ana, I5/SR-55 Congestion Relief Corridor Project, Santa Ana, CA - Doug analyzed and <br />designed a complete TOS for these arterial corridors including CCTV, CMS, HAR, Video Detection Systems <br />and citywide fiber opric/copper wire communications. <br />? Brookhurst Street Fiber Trunk, City of Anaheim, CA - Doug was engineer of record on the Brookhurst <br />Street Trunk Closure project in Anaheim. Project consisted of installation of three miles of fiber optic <br />interconnect as part of an SlRfunded project to complete the City fiber optic loop. <br /> <br />I1 <br />25H-24
The URL can be used to link to this page
Your browser does not support the video tag.