My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
FULL PACKET_2013-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:22 PM
Creation date
8/1/2013 3:57:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1044
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• In Portland, $3.5 billion was invested within 2 blocks of the initial <br />streetcar alignment <br />• In Seattle, $2.4 billion in investment occurred within 3 blocks of the <br />streetcar line <br />• Tampa gained $1 billion in investment within 3 blocks of its streetcar <br />line <br />• Little Rock attracted $816 million in capital investment along its 3 -mile <br />River Rail streetcar corridor within 10 years <br />• Santa Ana /Garden Grove investment potential being evaluated as part <br />of the next phase of the project. <br />• Preliminary analysis anticipates a similar level of investment as Little <br />Rock. <br />Streetcar Economic Develooment Potential <br />Cost Estimates <br />tS i+l4kAI&ts` $16,4 $13.2 <br />Streetcar 1 $2311.4 $49 <br />Streetcar 2 $257.0 $6,1 <br />$1.5 <br />$112 <br />$141 <br />516.4; <br />$43 <br />$21:13 , <br />$18.4 <br />$61 <br />534.5 <br />1. All costs in millions <br />2. Annualized Costs are based on a 12 -year bus and a 25 -year streetcar <br />useful life per FTA depreciation schedule <br />3. Full cost, including previously funded phases, year of expenditure, <br />Cordoba Corporation, July 2013 <br />4. Includes O &M costs for travel time improvements outside the study <br />area <br />Cost Comparison to Other Systems <br />With a pre- construction capital cost estimate of $47.5 million per mile, the <br />cost of the Santa Ana - Garden Grove system is on par with other streetcar <br />and BRT systems being planned and /or built: <br />• Tucson's nearly completed streetcar cost $50.5 million /mile <br />• Seattle's First Hill streetcar will cost $53.6 million /mile <br />MINUTES SPECIAL MEETING 5 JULY 23, 2013 <br />10E -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.