My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
FULL PACKET_2013-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:22 PM
Creation date
8/1/2013 3:57:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1044
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />AUGUST 5, 2013 <br />TITLE: <br />CONTRACT AWARD FOR BROADWAY <br />REHABILITATION FROM CIVIC CENTER <br />TO SANTA CLARA (PROJECT 11 -6743) <br />AND BROADWAY AND WASHINGTON <br />AVENUE WATER MAIN IMPROVEMENTS <br />(PROJECT 11 -6415) <br />k� <br />CITY NONAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1" Reading <br />❑ Ordinance on 2 n Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to the lowest responsible bidder, Christensen Brothers General <br />Engineering, Inc., in accordance with the Base Bid totaling $4,302,858.65 for the construction <br />of the Broadway Rehabilitation and Broadway and Washington Avenue Water Main <br />Improvements. <br />2. Approve the Cost Analysis for a total estimated project delivery cost of $5,163,430.65. <br />DISCUSSION <br />This project has received Council budget and funding approval as part of the City's Capital <br />Improvement Program. Project design is complete and the next step is to construct the <br />improvements. Procurement procedures have been followed as established by the City's <br />Municipal Code and in adherence to the Public Contracts Code. The project was advertised for <br />solicitation of bids, and the recommended action will allow construction to proceed. <br />The City's Pavement Management System identified Broadway from Civic Center Drive to Santa <br />Clara Avenue (Exhibit 1) as a high priority for rehabilitation. The pavement has deteriorated due <br />to weather, age, heavy usage, and poor drainage. Portions of the adjacent curb and gutter, <br />driveway approaches, curb ramps, and sidewalks are either missing or in disrepair and require <br />replacement. Improvements include reconstructing the roadway pavement; replacing damaged <br />concrete curb and gutter, driveway approaches, sidewalk; and constructing new cross gutters. <br />Once completed, these improvements will extend the life of the pavement and enhance the ride <br />quality, surface drainage, and appearance of the street. <br />Other project improvements include replacing deteriorated and undersized water mains on <br />Broadway and Washington Avenue. This work involves installing new water mains, fire hydrants, <br />main gate valves, and water services. Once this project is completed, breaks and leaks <br />23B -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.