My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
FULL PACKET_2013-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:20:22 PM
Creation date
8/1/2013 3:57:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1044
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE if RATE SCHEDULE <br />Schedule of Fees and Charges <br />for <br />City of Santa Ana — Urban Discharge Diversion Project <br />January 1, 2011 <br />This Schedule of Fees and Charges dated January 1. 2011 will remain in effect through December 31, <br />2012 The Schedule of Fees and Charges will be adjusted annually on July 1 of each subsequent year <br />to reflect merit and economic salary increases and changes in the expected level and mode of <br />operations. The basis of adjustment will 5% (five percent). The new Schedule of Fees and Charges will <br />apply to existing and new assignments <br />PERSONNEL CHARGES OTHER PROJECT CHARGES <br />I he dturgc for all time rcyuiied in the performance of the Subcontractors and Equipment Rental <br />Scup" of Sanice, includine office, field and tra%el lime, <br />gill he at file I nit Price liourh rates set Innh below fix I he a%sl of sea ices athcontmded b% I RS to other. and <br />file lahnr ;Inssi lir;n iom indieatcd. <br />�+ther .osls incuncd b% (Al4 trill he charged it uul <br />plot 9 "... <br />Labor Classification _ _ Houriv Rate <br />Principal-in-Charge . Principal Scientist $ 190 <br />Project Manager $ 185 <br />Senior Project Engineer $ 155 <br />Project Engineer. Geologist. Scientist $ 120 <br />Staff Engineer, Geologist. Scientist $ 85 <br />Senior Environmental Sclenhst)Planner $ 155 <br />Environmental Scientist/Planner 5 120 <br />Drafter /Illustrator $ 85 <br />GIS Mapping Services S 130 <br />Clerical $ 70 <br />Senior Field Technician $ g5 <br />Intern Student $ 65 <br />1 herinnc jhuurs mvAcd in crecss of eiehl 1X1 hours per <br />dayj b% ewillpt p,nonncl will be charged al the abort <br />huurh rant fherlime M non- e.%anpt personnel will be <br />charged dl I _" Tillie, the ahme hourh rales. <br />11 ilia 1 ITS ,lath appears as cyttrl %%imesses al tourl <br />trials. mcdi:nian. arhitnown hearings and depositions. <br />Ihcir tinm will hC eh;ugcd ;it _n limas the slanda"i rslc. <br />\II lime spell, prcpnring till .uch Irish. he:aiug. ;unl <br />Jcp.iiirn +%%ill he chi cd al The standard labor rat,. <br />Document Reproduction <br />In -ho,he reproducliun %till he changed ai S.lu il page Ior <br />hlack and white ;uuf S I _'S page I nr color. <br />Vehicles and Mileage <br />IRS field %ehicles (pick -ups, taus. Tnie6s. em.1 shed kin <br />project ,issii-nmants %%ill be charged at S80.1 0 per da%. <br />Rental %"hides including 610 %%ill be Chnrced ;u Cost <br />plus S "n fhc mileage charve fix personal autos %%ill he <br />the mileage rare as eslablishcd M the Internal Roenuc <br />tics ice and in elect al the little it personal "kilo c used in <br />pro%iding antsulri ml sea ice.. <br />This lee schedule contains confidential business information and is not to be copied or <br />distributed for any purpose other than the use intended in this contract. <br />25H -40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.