My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (4)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:39:56 AM
Creation date
8/29/2013 6:47:16 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
8/5/2013
Expiration Date
3/21/2014
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />To: <br />From: <br />Subject: <br />David Cavazos <br />City Manager <br />Date: January 29, 2014 <br />William Galvez, Interim Executive Director , <br />Public Works Agency =' <br />Project 13 -6784 & Project 12 -6776 McFadden Avenue Rehabilitation From Vest City <br />Limit To Newhope 0" <br />Change Order No. 1 <br />CONTRACTOR : All American Asphalt <br />PO Box 2229 <br />Corona, CA 92878 <br />PROJECT DESCRIPTION: McFadden Avenue Rehabilitation from West City Limit to Euclid <br />(Project 13 -6784) and From Euclid to Newhope (Project 12 -6776) <br />CHANGE ORDER NUMBER: 1 CHANGE ORDER AMOUNT: $ 32,718.92 <br />ACCOUNTING UNIT - ACCOUNT - ACTIVITY NUMBER: 03017660- 66220-12677602027 <br />03217662- 66220 - 12677703027 <br />05917663 - 66220 - 13678401028 <br />03217662 - 66220- 13678402028 <br />JUSTIFICATION <br />EXTRA WORK AT AGREED PRICE <br />1. In an effort to increase motorist and pedestrian safety within the project limits, Traffic <br />Engineering has requested that two Fortel® VCalm® radar speed limit signs be installed <br />along McFadden Avenue. This cost includes the signs, installation, type 1 -A pole and <br />foundation. (PCO #02) <br />AGREED PRICE $ 29,941.42 <br />2. After the traffic signal loops were installed per plan, Traffic Engineering requested that an <br />additional three type Q bicycle loops be installed in the new bike lanes at Euclid (2) and <br />at Newhope (1) that were inadvertently omitted from the plans. (PCO #03) <br />AGREED PRICE $ 2777.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.