Laserfiche WebLink
CITY OF SANTA ANA <br />PROJECT 12-2620, RPSTPLE 5063 (143) — FLOWER STREET BIKE TRAIL GAP CLOSURE <br />PROPOSAL & CONTRACT AGREEMENT <br />BID PROPOSAL, continued <br />Item # <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />13. <br />Furnish and Install 5' Wrought Iron <br />LF <br />2,100 <br />$ 50 <br />$ <br />05000 <br />Fence <br />14. <br />Furnish and Install 5' Wrought Iron <br />EA <br />1 <br />$ 1060 <br />$ <br />/000 <br />Gate <br />15. <br />Furnish and Install 5' Wrought Iron <br />EA <br />2 <br />$ °%��% <br />$ <br />/I/00 <br />Ace. Door <br />16. <br />Furnish and Install Guard Cable Fence <br />LF <br />2,200 <br />$ <br />$ <br />316100 <br />(H=3.5') <br />17. <br />Furnish and Install Collapsible Bollard <br />EA <br />4 <br />$ /000 <br />$ <br />14000 <br />18. <br />Furnish and Install Trash Receptacle <br />EA <br />2 <br />$ 000 <br />$_q <br />Y00 <br />19. <br />Signing and Striping <br />LS <br />I <br />s/0500 <br />$ <br />1656o <br />20. <br />Furnish and Install New No. 6 Pullbox <br />EA <br />9 <br />$� <br />$ <br />/800 <br />21. <br />Furnish and Install Pedestrian Push <br />EA <br />4 <br />$ IDo 0 <br />$ <br />L1000 <br />Button* <br />22. <br />Temporary Construction Sign <br />EA <br />2 <br />$ Sri® <br />$ <br />1600 <br />23. <br />Drainage System <br />LS <br />1 <br />$ V <br />$ <br />?)-Id <br />24. <br />Landscape System*** <br />LS <br />1 <br />$ '�'lgoo <br />$ <br />dlgdo <br />25. <br />Orange County Conservation Corps <br />EA <br />5,154 <br />$ 4.00$ <br />20,616 <br />Planting (I & 5 gallon shrubs)* <br />26. <br />Irrigation System <br />LS <br />1 <br />$ <br />12-3,�DO <br />27. <br />31 -Day Landscaping and Irrigation <br />LS <br />I <br />$ 000 <br />$ <br />Mo0 <br />Maintenance Period <br />28. <br />2" PVC Conduit* <br />LF <br />200 <br />$ <br />29. <br />3" PVC Conduit* <br />LF <br />200 <br />$ )- J5 <br />$ <br />Soo <br />30. <br />Relocate Existing Palm Tree <br />EA <br />2 <br />$ ' 5500 <br />$ <br />5600 <br />TO BE INCLUDED IN BID PACKAGE <br />BP 2 of 29 <br />