My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREEN GIANT LANDSCAPE, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GREEN GIANT LANDSCAPE, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 2:12:45 PM
Creation date
8/29/2013 7:08:20 AM
Metadata
Fields
Template:
Contracts
Company Name
GREEN GIANT LANDSCAPE, INC.
Contract #
12-2620
Agency
Public Works
Council Approval Date
8/5/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA DOCUMENT A3107a - 2010 <br />BID BOND <br />Any singular reference to Contractor, Surety, Owner or otherparty shalt be considered plural whore applicable, <br />CONTRACTOR SURETY (Name, legal status and principal place ofhusiness): <br />(Name, legal status and address): Philadelphia Indemnity Insurance Company <br />Green Giant Landscape, Inc. 251 S. Lake Ave., Suite 360, Pasadena, CA 91101 <br />941-A Macy St., La Habra, CA 90631 <br />OWNER <br />(Name, legal status and address): <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana CA 92701 <br />BOND AMOUNT: <br />Ten percent (10%) of the total amount of the bid <br />PROJECT: <br />(Name, location or address, and Project number, if any) <br />Project 12-2620, HPSTPLIE 5063 (143) - Flower Street Bike Trail Gap Closure <br />The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety <br />bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The <br />conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or <br />within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the <br />Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract <br />Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance <br />of such Contract and for the prompt payment of labor and material furnished In the prosecution thereof: or (2) pays to the Owner the <br />difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount .for which the <br />Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, <br />otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to <br />extend the time in which the Owner may accept the bid, Waiver of notice by the Surety shall not apply to any extension exceeding sixty <br />(60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall <br />obtain the Surety's consent for an extension beyond sixty (60) days. <br />If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />Printed in cooperation with the American Institute of Architects (AIA) <br />The language in this document conforms to the language used in AIA Document A310 w. 2010. <br />
The URL can be used to link to this page
Your browser does not support the video tag.