My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREEN GIANT LANDSCAPE, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GREEN GIANT LANDSCAPE, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 2:12:45 PM
Creation date
8/29/2013 7:08:20 AM
Metadata
Fields
Template:
Contracts
Company Name
GREEN GIANT LANDSCAPE, INC.
Contract #
12-2620
Agency
Public Works
Council Approval Date
8/5/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 12-2620 <br />Request for Approval of Change Order No. 2 <br />July 28, 2014 <br />Page 2 of 3 <br />3. The contract documents require the Contractor to furnish and install eleven palm trees to <br />complement the landscaping along the bike trail. However, the palm tree planting and <br />drainage detail was inadvertently omitted from this project. In order to procure proper <br />installation and drainage at each tree, staff requested the Installation of perforated 4 -Inch <br />diameter pipes with crush rock and filter fabric, additional irrigation laterals and two <br />inspection tubes with filter fabric. Therefore, it is recommended to compensate the <br />contractor for the extra work at each tree, (PCO #11), <br />Agreed Cost = $2,474.75 <br />4. As part of the contract documents, plans call for a new irrigation system including a <br />calsense controller, The system is to be installed and connected directly onto an existing <br />Irrigation system located just north which operates from its isolated water source and <br />uses its own controller. In order for the system to function properly, the new system <br />must isolate and contain its own master valve and flow sensor. Furthermore, the plans <br />called for a local radio communication controller as part of the contract. However, the <br />city of Santa Ana uses phone modem communication instead. To correct these <br />problems, the controller was modified and a phone modem was added in order to make <br />the system function properly. Therefore, it is recommended to compensate the <br />contractor to separate the system by installing a new master valve and flow meter along <br />with the coordination, removal, modification and re -installation of the controller. (PCO #9 <br />& #10). <br />Agreed Cost = $4,111,44 <br />EXTRA WORK AT AGREED UNIT PRICES <br />The contract documents require the contractor to furnish and install 686 5 -gallon <br />Douglas Iris plants (Bid Item #40) and 68 24 -inch London Plane trees (Bid Item #43) as <br />part of the landscaping. However city staff and the contractor determined the layout to <br />accommodate only 440 plants and 32 trees. Therefore, the contractor requested an <br />adjustment in unit bid price for since the quantity decreased more than 25 percent as <br />stated in the Green book. The following contract items were added to compensate the <br />contractor for the decrease in quantity as a result of site conditions. <br />Item <br />No <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />50 <br />5 Gallon Iris Douglasiana; <br />Dou las Iris <br />EA <br />440 <br />$14.03 <br />$6,173.20 <br />51 <br />24" Platanus Acerifolia: <br />London Planetrea <br />EA <br />32 <br />$358.00 <br />$11,456.00 <br />SUBTOTAL <br />$17,629.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.