My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20D - AA - INSTALL LED MAST ARM STREETLIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/03/2013
>
20D - AA - INSTALL LED MAST ARM STREETLIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 5:02:17 PM
Creation date
8/29/2013 4:31:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20D
Date
9/3/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> Exhibit A <br /> <br /> CITY OF SANTA ANA <br /> LED COBRAHEAD STREETLIGHTS <br /> <br /> SCOPE OF SERVICES <br /> <br /> SPECIAL PROVISIONS <br /> The Request for Proposals calls for removal and disposal of existing luminaires; <br /> furnishing and installing new LED street lights and all testing, including photometric and <br /> energy consumption, to prove that furnished luminaires perform as specified. <br /> <br /> The Contractor shall provide at its own risk and cost all labor, materials, tools, <br /> equipment, and traffic control per the Work Area Traffic Control Handbook ("WATCH"), <br /> transportation, hauling, dumping, and recycling of removed material as part of this <br /> project. The City reserves the right to salvage existing luminaires. All salvaged <br /> luminaires shall be delivered to the City Corporate Yard at no cost to the City. <br /> Contractor shall install luminaries in conformance with Attachment 1, Leotek Proposed <br /> Products. <br /> 1. FUNCTIONS AND RESPONSIBILITIES <br /> <br /> A. DIRECTOR <br /> The Director or his authorized representative shall have the authority to <br /> accept/reject materials, workmanship and to make minor changes in work or schedule. <br /> When the performance of the work or completion per schedule is determined to be <br /> substandard, Director may 1) recommend that all or a portion of payment be withheld, <br /> and/or forfeiture for delay be assessed; 2) direct the work be accomplished by a <br /> separate contractor, in order to complete the necessary work as close to schedule as <br /> possible and withhold the resulting costs. Payment to be withheld shall be deducted <br /> from the final payment due to Contractor, or if the amount is insufficient to cover <br /> payment, Contractor shall be liable and will be billed accordingly. <br /> The Director or his authorized representative shall decide all questions, which <br /> may arise as to the manner of performance and completion per schedule, acceptable <br /> fulfillment of the contract by Contractor, interpretation of the specifications, and <br /> compensation to include completion of work by alternate sources. <br /> B. CONTRACTOR <br /> <br /> 1. Local Office <br /> <br /> Contractor shall maintain a local office with a competent representative who can <br /> be reached during normal working hours and authorized to discuss matters pertaining to <br /> this contract with the Director. Contractor will not be allowed to store equipment or <br /> materials at any contracted area. <br /> 2. Submittals <br /> <br /> Contractor shall submit to the Director for his approval, prior to commencement <br /> <br /> <br /> <br /> 20D-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.