My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-09-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/03/2013
>
FULL PACKET_2013-09-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:19:22 PM
Creation date
9/3/2013 7:47:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/3/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23B CONTRACT AWARD FOR BROADWAY REHABILITATION FROM CIVIC <br />CENTER TO SANTA CLARA (PROJECT 11 -6743) AND BROADWAY <br />AND WASHINGTON AVENUE WATER MAIN IMPROVEMENTS <br />(PROJECT 11 -6415) -Public Works Agency <br />MOTION: <br />1. Award a contract to the lowest responsible bidder, Christensen <br />Brothers General Engineering, Inc., in accordance with the Base <br />Bid totaling $4,302,858.65 for the construction of the Broadway <br />Rehabilitation and Broadway and Washington Avenue Water Main <br />Improvements. <br />2. Approve the Cost Analysis for a total estimated project delivery <br />cost of $5,163,430.65. <br />MOTION: Amezcua <br />VOTE: AYES: <br />NOES: <br />ABSTAIN: <br />ABSENT: <br />SECOND: Tinajero <br />Amezcua, Benavides, <br />Sarmiento, Tinajero (6) <br />None (0) <br />None (0) <br />Reyna (1) <br />Martinez, Pulido, <br />23C CONTRACT AWARD FOR THE FLOWER STREET BIKE TRAIL FROM <br />MACARTHUR BLVD. TO SUNFLOWER AVE. (PROJECT 12 -2620) - <br />Public Works Agency <br />MOTION: <br />1. Award a contract to the lowest responsible bidder, Green Giant <br />Landscape, Inc., in accordance with the Base Bid plus Bid Item <br />Nos. 47 and 49 of Add Alternate 1, totaling $968,500 for the <br />construction of Flower Street Bike Trail from MacArthur Blvd. to <br />Sunflower Ave. <br />2. Approve the Cost Analysis for a total estimated project delivery <br />cost of $1,259,050. <br />MOTION: Martinez <br />VOTE: AYES <br />SECOND: Tinajero <br />Amezcua, Benavides, Martinez, Pulido, <br />Sarmiento, Tinajero (6) <br />CITY COUNCIL MINUTES 14 AUGUST 5, 2013 <br />1 OA -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.