My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-05 Regular
Clerk
>
Minutes
>
CITY COUNCIL
>
2010-2019
>
2013
>
2013-08-05 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 11:10:36 AM
Creation date
9/9/2013 10:14:55 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Agency
Clerk of the Council
Date
8/5/2013
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23B CONTRACT AWARD FOR BROADWAY REHABILITATION FROM CIVIC <br />CENTER TO SANTA CLARA (PROJECT 11-6743) AND BROADWAY <br />AND WASHINGTON AVENUE WATER MAIN IMPROVEMENTS <br />(PROJECT 11-6415) - Public Works Agency <br />MOTION: <br />1. Award a contract to the lowest responsible bidder, Christensen <br />Brothers General Engineering, Inc., in accordance with the Base <br />Bid totaling $4,302,858.65 for the construction of the Broadway <br />Rehabilitation and Broadway and Washington Avenue Water Main <br />Improvements. <br />2. Approve the Cost Analysis for a total estimated project delivery <br />cost of $5,163,430.65. <br />MOTION: Amezcua SECOND: Tinajero <br />VOTE: AYES: Amezcua, Benavides, Martinez, Pulido, <br />Sarmiento, Tinajero (6) <br />NOES: None (0) <br />ABSTAIN: None (0) <br />ABSENT: Reyna (1) <br />23C CONTRACT AWARD FOR THE FLOWER STREET BIKE TRAIL FROM <br />MACARTHUR BLVD. TO SUNFLOWER AVE. (PROJECT 12-2620) - <br />Public Works Agency <br />MOTION: <br />1. Award a contract to the lowest responsible bidder, Green Giant <br />Landscape, Inc., in accordance with the Base Bid plus Bid Item <br />Nos. 47 and 49 of Add Alternate 1, totaling $968,500 for the <br />construction of Flower Street Bike Trail from MacArthur Blvd. to <br />Sunflower Ave. <br />2. Approve the Cost Analysis for a total estimated project delivery <br />cost of $1,259,050. <br />MOTION: Martinez SECOND: Tinajero <br />VOTE: AYES: Amezcua, Benavides, Martinez, Pulido, <br />Sarmiento, Tinajero (6) <br />CITY COUNCIL MINUTES 14 AUGUST 5, 2013
The URL can be used to link to this page
Your browser does not support the video tag.