My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - CUP - 803 S SULLIVAN ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
31C - CUP - 803 S SULLIVAN ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:36:15 AM
Creation date
9/12/2013 4:38:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31C
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />The closest enclosed body of water that could result in an earthquake-induced seiche to the site is <br />the Prado Dam located 19 miles upstream from the project site. The Santa Ana River Main Stem <br />Project has implemented flood control improvements to both the Prado Dam and Lower Santa Ana <br />River, which has reduced the risk of inundation in the event of a seiche in the Prado Dam (Orange <br />County Flood 2011). Therefore, there would be no impact on the project site as a result of overflow <br />caused by a seiche. <br />The project site is located within a fully developed area, and on a site with limited topographical <br />relief. The project site is not located downhill from any slope of sufficient size to cause mudflows. <br />Therefore, the proposed project would not result in impacts associated with mudflows. <br />The Bat Nha Buddhist Meditation Center 3-58 June 2013 <br />Initial Study/Mitigated Negative Declaration ta002IS.17 <br />31C-111
The URL can be used to link to this page
Your browser does not support the video tag.