My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - GRANT ALT ENERGY PROJECTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
55B - RESO - GRANT ALT ENERGY PROJECTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 8:37:12 AM
Creation date
9/12/2013 5:24:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
55B
Date
9/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />Payment Schedule <br />City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />Contract Number M02014 <br />Cost Breakdown <br /> Maximum <br /> AB2766 CONTRACTOR <br />Purchase Discretionary A132766 i Other Funds Total Cost <br />Category Funds payable Subvention Applied <br /> I <br />under this Funds Applied <br /> Contract <br />Heavy Duty $270,000 (not to <br />CNG and exceed $30,000 $155,000 $250,000 $675,000 <br />LPG per vehicle) <br />Vehicles <br />Expand CNG $46,000 $3,000 $43,000 $92,000 <br />station __ <br />EV Charging $68 <br />000 $68,000 $0 $136,000 <br />Stations , <br /> <br />Totals _ <br />$384,000 <br />$226,000 <br />$293,000 <br />$903,000 <br />CONTRACTOR shall be reimbursed according to the amounts stated above per vehicle <br />upon proof of vehicle delivery, vehicle acceptance, and placement of vehicle into <br />service. Documentation of the specific engine installed in the vehicle, including the <br />year, manufacturer, and model, must accompany each request for reimbursement. <br />Reimbursement for station will be made: <br />• only after verification of station completion. At a minimum, acceptable <br />verification shall consist of: <br />o Representative photos of completed station; <br />o a report signed by a responsible official certifying that the station has been <br />completed as described in Attachments 1 and 3; and <br />o invoice(s) from subcontractor(s) performing the installations, if any. <br />Reimbursement for EV charging stations will be made: <br />• only for site preparation construction, equipment purchase, and installation costs; <br />and <br />• only after verification of completion. At a minimum, acceptable verification shall <br />consist of: <br />o Representative photos of completed stations; <br />o a report signed by a responsible official certifying that the stations have been <br />completed as described in Attachments 1; and <br />o invoice(s) from subcontractor(s) performing the installations, if any. <br />55B-18
The URL can be used to link to this page
Your browser does not support the video tag.