My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - 1901 E FIRST ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
75A - PH - 1901 E FIRST ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 4:11:52 PM
Creation date
9/12/2013 5:37:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/16/2013
Destruction Year
2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4 Mitigation Monitoring and <br />Reporting Program <br />4.1 INTRODUCTION <br />The Calefomia DmhonneetlolQemli!yAd (CEQA) requires the adoption of feasible mitigation measures to <br />reduce the severity and magnitude of potentially significant environmental impacts associated with <br />project development. The Final Environmental Impact Report (Final EIR) for the proposed Metro East <br />Mixed Use Overlay Zone EIR (State Clearinghouse No.2006031041) located within the City of Santa <br />Ana (City), includes program and project - specific mitigation measures to reduce the potential <br />environmental effects of the Overlay Zone, as well as the First and Cabrillo Towers Project. <br />Monitoring of the implementation of adopted mitigation measures is required by Public Resources Code <br />Section 21081.6. The Final EIR for the proposed project provides a list of mitigation measures, and <br />describes the process whereby the mitigation measures would be monitored. Following certification of <br />the Final EIR and approval of this 'Mitigation Monitoring Program (MMP) by the City, the mitigation <br />measures included in the Final EIR would be monitored as described in this MMP. It should be noted <br />that because this EIR contained program- and project -level components, two separate MMP tables are <br />presented as part of this MMP for the Overlay Zone and for the First and Cabrillo Towers project. <br />4.2 PURPOSE <br />The purpose of the proposed Overlay Zone EIR MMP is to ensure compliance with all mitigation <br />measures to mitigate or avoid potentially significant adverse environmental impacts resulting from the <br />proposed project that were identified in the Final EIR. Implementation of this DgVIP shall be <br />accomplished by the City of Santa Ana. Mitigation measures will be implemented (1) as part of design <br />development of the project, (2) during project construction, or (3) as part of project operations. <br />4.3 RESPONSIBILITIES AND DUTIES <br />In general, monitoring will consist of demonstrating that mitigation measures were implemented, and <br />that the responsible unit monitored the implementation of the measures. The responsible unit for <br />determining compliance with all mitigation measures will be the City. Monitoring will consist of <br />determining whether <br />• The specific issues identified in the mitigation measures were considered in the design <br />development phase <br />• Construction contracts included the provisions specified in the mitigation measures <br />• The required actions specified in the mitigation measures occurred prior to or during construction <br />• Ongoing administrative activities included the provisions identified in the mitigation measures <br />Metro East Mixed Use Overlay Zone (Volume Ill) 41 <br />IN, is <br />
The URL can be used to link to this page
Your browser does not support the video tag.