My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
09/16/2013
>
CORRESPONDENCE - 75A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2013 5:02:25 PM
Creation date
9/16/2013 5:00:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
9/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uilo,l? 2 2ivaPark (949) 851-5 367 <br />'ZO70 ;949) 8Sl .5179 <br />P1rzadeh S30 E1 <br />Irvine, CA 92614 4726 wwwprzaden.com <br />September 16, 2013 <br />Ms. Cynthia Eppeldauer <br />Vice President, Development <br />Lyon Capital Ventures <br />4901 Birch Street <br />Newport Beach, CA 92660 <br />Subject: First Street Apartments Traffic Analysis <br />Dear Cynthia: <br />The scope of work for the traffic analysis prepared for the subject project was reviewed and <br />approved by the City of Santa Ana Transportation Engineering staff. Based on our <br />discussions with staff it was determined that the traffic volume projections presented in the <br />Katz, Okitsu & Associates analysis conducted in December 2006 were still valid as the <br />basis of impact analysis for the proposed project. The projections in that study considered <br />Year 2010 and 2030 horizon years. Due to the economic conditions over the last several <br />years the overall area-wide traffic volumes have decreased when compared to previous <br />projections (i.e., the regional County Traffic Model OCTAM data indicates traffic volume <br />reductions of up to 15 percent compared to projections published in 2005-2007) and no new <br />projects have been approved in the vicinity of the proposed project. Therefore, today's <br />traffic volumes around the project sites are lower than the previously projected Year 2010 <br />with-project volumes. Finally, the proposed project has a significantly lower trip generation <br />when compared to the previously approved project. <br />Please call me if you have any questions regarding the information presented in our traffic <br />analysis or this letter. <br />Sincerely, <br />l <br />Peter K. Pirzadeh, P.E. <br />Principal <br />P.1V 14316(2)-PirstStreetApts-09162013 •CEppeldauer-Trafficanalysis- Itr.pkp
The URL can be used to link to this page
Your browser does not support the video tag.