My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 8F - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE 8F - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 3:53:26 PM
Creation date
9/19/2013 10:58:41 AM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2013-025
Agency
PUBLIC WORKS
Council Approval Date
2/4/2013
Expiration Date
6/30/2014
Insurance Exp Date
7/1/2014
Destruction Year
2020
Notes
Amends A-2007-167, A-2008-139, -001, -002, -003, A-2012-074 Amended by A-2013-025-01
Document Relationships
PLACEWORKS FORMERLY KNOWN AS THE PLANNING CENTER 8g - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8B - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8C - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8D - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8E - 2012
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Studies <br />Environmental technical studies provide the key data, analysis, findings, and mitigation recommendations that are <br />incorporated into the EIR. While broken down into several different tasks, The Planning Center team views the technical <br />study effort as a filly integrated process with the engineering and outreach processes, as well as internally between <br />environmental tasks. <br />TRAFFIC IMPACT ANALYSIS <br />IBI Group will perform a Traffic Impact Analysis (TIA) for the Warner Avenue project according to the latest adopted City of <br />Santa Ana standards and guidelines. The objective of the TIA will be to establish future traffic conditions with the proposed <br />project and identify traffic mitigation measures that may be necessary to address project - related traffic impacts. The traffic <br />impact analysis will incorporate the following components: <br />Data Collection /Existing Traffic Conditions <br />IBI will evaluate existing traffic and circulation conditions in the vicinity of the project site which includes the following <br />components: I) intersection operating conditions for typical weekday AM /PM peak hour conditions, 2) descriptions of <br />geometric roadway conditions within and adjacent to the project site, 3) description of existing transit services in the vicinity <br />of project site, and 4) roadway daily traffic volumes and Beet mix. <br />Peak period traffic counts will be conducted as necessary to establish the existing condition at study intersections. IBI Group <br />will work with the City of Santa Ana to identify appropriate study intersections and to obtain existing counts available from <br />the City. The traffic scope assumes the analysis of signalized intersections within the project limits, as well as the next major <br />signalized intersections to the east and west of the project limits (assumed to be Flower Street and Wright Street). We also <br />propose to include the intersections of Main Street and Grand Avenue with Dyer Road and Edinger Avenue to assess the <br />changes in traffic conditions along the parallel east -west corridors with the implementation of the proposed project. IBI <br />Group will also conduct daily roadway traffic counts within the project limits to determine the existing traffic volumes. These <br />traffic counts will include the collection of vehicle axle data to determine the existing vehicle Beet mix for inclusion in the <br />noise and air quality studies for the environmental document. IBI wig field review all study intersections to determine <br />existing geometric conditions including number and type of lanes and signal phasing. Existing intersection operating <br />conditions (in terms of volume /capacity ratios and level of service) will be quantified using the ICU analysis methodology as <br />adopted by the City of Santa Ana. <br />Future Conditions <br />Per California Environmental Quality Act (CEQA) guidelines, IBI will forecast future traffic conditions without the proposed <br />project. We will work with the City of Santa Ana to develop an appropriate forecast of future traffic conditions for the <br />roadway. One option includes the use of the Orange County Transportation Analysis Model (OCTAM) to develop future <br />forecast traffic volumes. This is the regional model for Orange County and uses the four -step process outlined by the City of <br />Santa Ana in the RFP to develop future traffic forecasts. We will work with OCTA to develop traffic forecasts for the future <br />without and with project conditions, allowing for a comparison of traffic volumes in the study corridor between the two <br />future scenarios. We will also obtain future forecast traffic volumes for other appropriate study streets including Main Street, <br />Grand Avenue, Dyer Road and Edinger Avenue. Study intersections that are forecast to experience an increase in level of <br />service due to cumulative project- related traffic will be highlighted. Graphics and tables will be used to illustrate the future <br />no- project traffic analysis results. The future with project traffic conditions will analyze the performance of the roadway and <br />study intersections following the implementation of the proposed improvements. Any significant impacts that result from the <br />proposed project will be identified and appropriate mitigation measures will be developed to address these impacts. <br />City of Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue W(dening Project The Planning Center I Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.