Laserfiche WebLink
6.9 Manner of Disbursement. City may make any disbursement by check payable to <br />Developer; or on a voucher basis; or by check payable jointly to Developer and any contractor, <br />subcontractor or other claimant; or directly to any such claimant; or by any other means <br />reasonably selected by City. <br />6.10 Cost Overruns. In the event that, at any time and for any reason, (a) the actual cost <br />reasonably estimated by City or Developer to be required to complete all matters included in any <br />line item in the Project Budget exceeds the amount allocated to that line item in the Project <br />Budget, (b) Project costs for any matters not covered by a specific line item have been or will be <br />incurred, or (c) the undisbursed portion of the Loan proceeds is or may be insufficient to pay all <br />construction of the Project that may be payable under the City Loan Documents or otherwise in <br />connection with the construction, Developer shall, within ten (10) days after it receives written <br />notice thereof from City of any of the foregoing matters, do one or more of the following: <br />(a) provide satisfactory evidence to City that Developer has previously <br />paid such excess or otherwise provided for such insufficiency (collectively, the "Excess Cost ") <br />with funds from a source other than the City Loan; <br />(b) reallocate sufficient funds to pay the Excess Cost from funds allocated to <br />"Contingency" in the Project Budget; provided, however, that the City Project Manager's consent <br />to any such reallocation shall be required; or <br />(c) deposit an amount equal to the Excess Cost in a non - interest bearing <br />account (the "Overrun Account ") with City from which withdrawals may be made only with the <br />consent of the City Project Manager but which will be exhausted prior to any further <br />disbursement for any line item, so that any resulting surplus in any line item of the Project <br />Budget will then be reallocated to the line item(s) in which the Excess Costs are expected to be <br />incurred. <br />City shall have no obligation to make further disbursements until Developer has paid or <br />otherwise provided for the overrun as required above. Amounts deposited by Developer in the <br />Overrun Account for any Excess Costs shall be disbursed by City prior to the disbursement of <br />any remaining Loan proceeds in the manner described in subsection 93(c). <br />6.11 Cost Savings. Upon completion of and disbursement for all matters covered by any line <br />items in the Project Budget, any remaining undisbursed amounts allocated to that line item shall <br />be reallocated to "Contingency" and thereafter be available for disbursement in accordance with <br />the terms of this Agreement. <br />6.12 Retainage. City will withhold a Retainage of 10% from each Disbursement for each <br />of the Hard Cost line items of the Project Cost Breakdown (and other line items thereof <br />designated for withholding of retainage) until all conditions to the final Disbursement of Hard <br />Costs have been satisfied. In lieu of City's withholding Retainage, Developer can by written <br />notice to City elect not to draw any overhead or profit as would otherwise be permitted under the <br />Construction Contract until such time as Retainage would otherwise have been released. <br />12 <br />