Laserfiche WebLink
Outline of On-the-Job Training Plan and Method of Assessment: <br />ELEMENTS OF TRAINING HOURS OF TRAINING <br />1. Objective 1 40 <br />Polishing Countertops & Walls using hand grinding machine <br />A) Will learn to use variable speed hand held grinder. <br />B) Trained to use pump/sprayer to supply water to the grinder <br />C) Grind and work on stone areas until scratches and defects are <br />removed. <br />Measurement Method: Q & A, task observation and inspection. Goal is to achieve rate <br />of proficiency within first Month and a half of training. <br />2. Objective 2 <br /> 200 <br />Natural Stone Repairs using epoxy, caulking, grout compounds <br />A) Will be trained on making sure area is clean, prepare & protect <br />sensitive areas. <br />B) Mix colors with epoxy to match stone and camouflage. This is very <br />crucial and takes time to master of mixing colors to match stone. <br />C) Will buff and seal repaired areas <br />Measurement Method: Q & A, task observation and inspection. Goal is to achieve rate <br />of proficiency within subsequent three and a half months. <br />3. Objective 3 <br />Polish floors using buffing machine 200 <br />A) Will learn to prepare area for buffing <br />B) Will measure and marls area to ensure polishing standards are <br />met. <br />C) Wash grit from stone, using hoses <br />D) File grooved, contoured, and irregular surfaces of natural stone <br />objects such as granite, travertine, marble, quartz, flagstone, <br />limestone. <br />Measurement Method: Q & A task observation and inspection. Goal is to achieve rate of <br />proficiency within subsequent three and a half months. <br />4. Objective 4 <br />Concrete Surface Decoration (Polishing, Staining, Epoxy coating) 200 <br />A) Will learn to polish concrete using a high gloss flooring finish. <br />Special diamond concrete grinding equipment will be used. <br />B) Trained to produce shiny, high gloss surface that is low <br />maintenance and attractive. <br />C) Will learn to stain and color concrete to create a variety of patterns <br />and colors. <br />Measurement Method: Q & A task observation and inspection. Goal is to achieve rate of <br />proficiency within subsequent three and a half months.