Laserfiche WebLink
O TETRATECH 17885 van Raamm,Wh M, IMau. CA 92514 <br />Tet 84A909.5000 <br />F. 949509.5010 <br />Client City ofSamm Ana Sheet No. 1 of I <br />Project: Westminster Ave Sewer Main Improvements Job No. 134-P00597-0086-04 <br />Cost Sharing Cost Estimate Computed by: MID <br />Chocked by MWB Date: 2142013 <br />Assumptions. 1. Percentage of cost assigned to Santa Am and Garden Grove equals the percentage of flow each City contributes bctown <br />each manhole. Sec anached zp..dah.t to, percalages. <br />2. Pereenugo of Imnp sum items in each reach is calculated as the percentage ofpipdm corubucted in each reach divided <br />by Wa anal amount ofpipcline. See Table A below. <br /> TABLE A- Per Lumts Sum Bid Items <br />Reach at ]8,4 340 10% <br />Reach N2 26.3 348 II% <br />Reach 03 03.2 <br />7 320 10% <br />Reach 04 03.3 296 9% <br />Reach NS 99.] 200 6% <br />Reach N6 9.6 326 10% <br />Reach N7 99.9 366 11% <br />Reach NB 7399.9 22.] <br />7522!7 373 II% <br />Reach 49 7022.7 6648.2 371 11% <br />Reach Y10 6648.2 6263.7 379 11% <br /> <br />P WaS9rMaGFi,gaeni?yWCSp FiO'mpelCan GiirvieLa?9ha4na