Laserfiche WebLink
June 17, 2013 <br />Page 16 <br />Justification: The station is 33 years old. The improvements described are limited to the fire <br />station side of the building. Firefighters are housed in a single dormitory room <br />that is inappropriate for mixed gender assignment. Installation of privacy <br />cubicles with doors and uniform lockers will bring the space into compliance <br />with OCFA standards. <br />The station kitchen has exceeded its reasonable service life. Kitchen systems are <br />old, broken and difficult to keep sanitary, safe and serviceable. It no longer <br />meets the need of station personnel and does not meet OCFA standards for a <br />crew kitchen. Photos attached. <br />The crew bathroom has exceeded reasonable service life and is inappropriate for <br />mix gender assignment. Photos attached. <br />Estimated Budget: (1) Dormitory Privacy $25,000 <br />(2) Remodel Kitchen $75,000 <br />(3) Remodel Crew Bathroom $60,000 <br />Total: $160,000* <br />Scope of (1) Demolition of current interior space and installation of new <br />Work: flooring, replacement of overhead lighting, new window covering, <br />procurement and installation of pre-fabricated cubicles with <br />privacy door, procurement and installation of uniform and <br />equipment locker. <br />(2) Demolition of existing kitchen space. Procurement and installation of <br />new flooring, lighting systems, lower and upper cabinets, installation <br />of SS counter system with integral single large sink and disposal <br />systems, replacement of faucets and fixtures, upgrade of electrical, <br />replacement of dishwasher, range with ventilation and refrigerators, <br />painting and finish. <br />(3) Demolition of existing space. Procurement and installation of <br />replacement flooring, overhead lighting, exhaust ventilation. <br />cabinets, shelving, counter, sink, and fixtures. Installation of privacy <br />showers and fixtures, painting and finish. <br />*Estimated budget does not include roof svstems bid: <br />Fair-Poor Foam and Tile A,000 6-8 & 3-4 (tile) $L,200 $I 10,000 <br />See photos on the next page. <br />25D-32 <br />(2) Remodel kitchen <br />(3) Remodel crew bathroom