Laserfiche WebLink
June 17, 2013 <br />Page 31 <br />(2) Replace flooring <br />(3) Replace Roof <br />Justification: (1) The station is 54 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Installation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />compliance with OCFA habitability standards. <br />(2) The current flooring is a mix of original and added carpet. The entire <br />interior is beyond serviceability and requires replacement. <br />(3) The station roof is a replacement foam roof system approaching the end <br />of its serviceable life. It fails frequently. Continued repair will not <br />provide added life. <br />Estimated Budget: (1) Dormitory Privacy $25,000 <br />(2) Replace flooring $25,000 <br />(3) Replace roof $25,000 <br />Total: $75,000 <br />Scope of (t) Demolition of current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre-fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker. <br />(2) Demolition/removal of all current floor covering, repair of flooring base <br />and installation of 18X18 composite vinyl tile, trim, base molding, finish <br />and paint as required. <br />(3) Demo] ition/tear-o ff of existing roof, repair as required, and addition of a <br />cricket drain and application of a buildup modified bitumen roof system. <br />Finish as required and installation. <br />See photos on the next page. <br />25D-47