My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
10/21/2013
>
25D - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 4:48:56 PM
Creation date
10/15/2013 3:39:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25D
Date
10/21/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 34 <br />Justification: (1) The station is 33 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Installation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />compliance with OCFA habitability standards. <br />(2) The crew bathroom has exceeded service life and is inappropriate for mix <br />gender use. See attached photographs. <br />(3) The existing roof is more than 25 years old and has reached serviceable <br />life. It fails continuously and is not economical to repair. Frequent <br />leak/failure risks damage to internal building structures and spaces. <br />Estimated Budget: (1) Dormitory privacy <$25,000 <br />(2) Remodel crew bathroom $30,000 <br />(3) Replace roof $33,000 <br />Total: $88,000 <br />Scope of (1) Demolition of current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre-fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker. <br />(2) Demolition of existing space. Installation of replacement flooring, <br />overhead lighting, exhaust ventilation, cabinets, shelving, counter, sink, <br />and fixtures. Replacement showers and fixtures and painting and finish <br />as required. <br />(3) Demolition/tear-off of the existing shingle roof, substrate repair as <br />required and replacement with a modified bitumen roof system finish as <br />required. <br />See photos on the next page. <br />25D-50 <br />(2) Remodel crew bathroom <br />(3) Replace roof
The URL can be used to link to this page
Your browser does not support the video tag.