My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
10/21/2013
>
25D - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 4:48:56 PM
Creation date
10/15/2013 3:39:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25D
Date
10/21/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 38 <br />(2) Replace flooring <br />Justification: (1) The station is 25 years old. The shower systems in each crew bathroom <br />are failing, leaking through shower wall and the shower floor pan. <br />Leaking is causing damage to the building structure. <br />(2) Carpet throughout the station is badly worn, torn and railing. It has <br />exceeded service life. The carpet chronically separates at seams and <br />loses adhesion to the floor, and has become a hazard. <br />Estimated Budget:., (I) Upgrade/repair showers $50,000 <br />(2) Replace flooring $30,000 <br />Total.: $80,000 <br />Scope of (1) Demolition of existing show stalls, repair as required, installation of <br />Work: shower walls, tile, hot mop, replace pan tile, grout paint and finish as <br />required. <br />(2) Demo] ition/removal of all current floor covering, repair of flooring base <br />and installation of 18X18 composite vinyl tile, trim, base molding, finish <br />and paint as required. <br />See photos on the next page. <br />25D-54
The URL can be used to link to this page
Your browser does not support the video tag.