Laserfiche WebLink
DESIGN -BUILD CONTRACTOR SERVICES <br />SANTA ANA MAIN LIBRARY <br />ELEVATOR MODERNIZATION <br />THIS AGREEMENT, made and entered into this 4`" day of November, 2013, by and <br />between 5 STAR ELEVATOR SERVICE, INC., a California corporation (hereinafter <br />"Contractor"), and the CITY OF SANTA ANA, a charter city and municipal corporation organized <br />and existing under the Constitution and laws of the State of California (hereinafter "City "). <br />RECITALS <br />1. The City desires to retain a Contractor having special skill and knowledge required to <br />design and build improvements to modernize the elevator at the Santa Ana Main <br />Library. <br />2. Contractor represents that Contractor is able and willing to provide such services to the <br />City and is licensed by the State of California to provide general contractor services. <br />3. In undertaking the performance of this Agreement, Contractor represents that it is <br />knowledgeable in its field and that any services performed by Contractor under this <br />Agreement will be performed in compliance with such standards as may reasonably be <br />expected from a professional contracting firm. <br />NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the <br />terms and conditions hereinafter set forth, the parties agree as follows: <br />SCOPE OF WORK <br />a. Contractor shall provide professional and technical engineering services required to <br />design and prepare construction drawings, time schedule and cost estimates for the <br />modernization of the existing hydraulic elevator at the Santa Ana Main Library <br />(hereinafter "Project "). Contractor shall provide project management, construction <br />management, skilled labor, equipment, supplies and materials required to construct <br />the Project on schedule in conformance with the approved plans and specifications, <br />as set forth in Request for Proposal 13 -038, specifically the Scope of Work attached <br />hereto as Exhibit A -1, and Contractor's Proposal dated September 20, 2013, <br />attached as Exhibit A -2. All attached Exhibits are incorporated by this reference. <br />b. Time for Performance. Contractor shall perform and complete all services required <br />to complete the project, in a timely and expeditious manner. Contractor shall <br />perform such services in accordance with the schedules which Contractor and City <br />may mutually agree. In the event that Contractor determines that a proposed <br />schedule for work as requested by the City is not possible or achievable, Contractor <br />shall immediately notify the City's Representative, in writing and seek modifications. <br />No extension of time shall be accepted unless it is evidenced in a writing executed <br />by each Party's Representative. <br />c. Progress Report. Contractor shall submit progress reports at least once a month. <br />The reports shall be sufficiently detailed for City's Project Manager to determine <br />whether Contractor is performing to expectations and on schedule, to communicate <br />interim findings, and to specifically address any difficulties or special problems <br />encountered, so remedies can be developed. <br />23A -5 <br />