My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
011805 Loan Agmt Orange Hsg Develop Corp Auth Relocation Plan
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2000-2009
>
2005
>
01/18/05
>
011805 Loan Agmt Orange Hsg Develop Corp Auth Relocation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 9:09:15 AM
Creation date
11/5/2013 9:08:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relocation Plan for the OHDC 901 East 6" Street Project <br />that are available inmost homes. The weekly rates for these units are from $245 -$511 and <br />are a less desirable choice for the length of stay needed for temporary displacees. The <br />median weekly rate expected at the time of displacement is $385 for a studio suite with a <br />full kitchen allowing up to four people in a room. It is anticipated that larger families will <br />require two such rooms to satisfy the decent, safe and sanitary requirements of temporary <br />replacement housing. <br />Since it is anticipated that six units at a time will be rehabilitated, it is expected that there <br />will be adequate temporary facilities to house the occupants. <br />Concurrent Displacement <br />The SantaAna Community College Expansion Project undertaken bythe Rancho Santiago <br />Community College District is expected to result in a permanent displacement of <br />approximately 55 households. Its location is about two miles west from the 61h Street <br />Project. Given its location and the minimal expected off -site replacement housing <br />requirements of the 6`h Street Project, it should be easy to satisfy both projects by existing <br />market opportunities. <br />Prepared by Overland, Pacific & Cutler, Inc. <br />4 -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.