My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
020507 Agmt Schindler Elevator Improv at SAWC
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2000-2009
>
2007
>
02/05/2007
>
020507 Agmt Schindler Elevator Improv at SAWC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 3:55:22 PM
Creation date
11/5/2013 3:55:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with Schindler <br />for Elevator Improvements <br />Design and Construction a <br />February 5, 2007 <br />Page 2 <br />DISCUSSION <br />Elevator Corporation <br />and Modernization <br />t the Santa Ana Depot <br />The Depot at Santa Ana is a regional transportation hub, combining <br />Amtrak, MetroLink, Orange County Transit Authority and other bus <br />services with office space for various State, County and City <br />departments. Patronage at the facility has escalated in recent years to <br />over a million persons annually. The Depot elevator modernization is <br />needed in order to bring the existing elevator up to current industry <br />standards. The existing equipment was installed in 1983 and the hall <br />and car were upgraded in 2002. The other major equipment is original <br />and is beyond the typical lifespan for this type of equipment. The <br />current elevator also does not stop level with the floor, which presents <br />a safety hazard and does not meet current ADA requirements. <br />The Public Works Agency completed an assessment of the existing elevator <br />in July 2006 and developed a list of recommendations for the <br />modernization of the elevator to address the abovementioned issues. <br />In November, a request for proposals was prepared based on the July 2006 <br />assessment and distributed to four specialty contractors. Two proposals <br />were received and evaluated by staff. <br />A summary of the rating scales and costs is as follows: <br />Firm Rating <br />Schindler Elevator Corporation 89 <br />RS Elevator 85 <br />Based on the information provided, the two <br />proposals included comparable scopes of work anc <br />construct the project. Schindler Elevator <br />performing ongoing maintenance under contract to <br />Ana Depot and its performance has been favorable. <br />Schindler Elevator Corporation be retained <br />modernization project. <br />6 -58 <br />Fee <br />$62,747 <br />$105,051 <br />firms that submitted <br />both are qualified to <br />Corporation has been <br />the City for the Santa <br />Staff recommends that <br />for this elevator <br />
The URL can be used to link to this page
Your browser does not support the video tag.