My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-050 - Addendum to the Final Environment Imapct Report No. 2006-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2013
>
2013-050 - Addendum to the Final Environment Imapct Report No. 2006-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2013 9:30:51 AM
Creation date
11/6/2013 9:25:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2013-050
Date
10/21/2013
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Driveway 2 is an existing driveway located off of East 1st Street. The driveway is restricted <br />to right and left -turns in/right -turns out and is stop sign controlled. A total of 16 AM and 48 <br />PM inbound peak hour trips and 27 AM and 16 PM outbound peals hour trips are projected. <br />The projected eastbound left -turn movement, 6 AM and 19 PM peak hour trips, will utilize <br />the existing 140' left -turn lane. The existing signal at East 181 Street and North Golden <br />Circle Drive will provide adequate gaps for the left -turn movement. The driveway will <br />access a 20' wide fire lane along the eastern property line and consists of one (1) inbound <br />lane and one (1) outbound lane. A new gated entry into the existing parking garage will be <br />installed approximately 260 feet north of East 15t Street. As shown on the proposed site <br />plan, this distance is also the effective driveway throat. Therefore, Driveway 2 will be able <br />to accommodate the projected trips. <br />Both access drives provide direct access to the existing parking garage for the project that <br />will accommodate resident and visitors parking needs. The north fire lane connects with <br />the east fire lane to enable site circulation from Driveway 1 to Driveway 2. A drop - <br />off/loading area is provided on the north fire lane approximately 80 feet east of Cabrillo <br />Park Dative and a covered loading area is provided at the northeast corner of the project <br />site. It should be noted that the existing Driveway 1 and Driveway 2 serves an existing 3- <br />story commercial building and the project site was previously approved for 374 residential <br />dwelling units and 8,957 square feet of specialty retail. The proposed project will generate <br />fewer trips and have less impact at the existing driveways. <br />Gate Stacking Analysis <br />The County of Orange Environmental Management Agency (EMA) Standard Plan No. 1107 <br />criteria is being utilized for determining the amount of vehicle storage length behind the <br />garage entry gates for the proposed residential project. This standard requires that gates <br />be set back between the prolongation of the near curb of any public street and the gate to <br />provide one (1) foot per dwelling unit or a minimum of 100 feet of storage for entering <br />vehicles to stack without interfering with the through movement along the adjacent public <br />street. <br />The project is served by two (2) parking garage entries that will be gated. Entry 1 is located <br />off of the northern fire lane approximately 305 feet east of Cabrillo Park Drive. The gate is <br />located at the face of the parking garage and is 22 feet wide that provides one 11 -foot <br />inbound lane and one 11 -foot outbound lane. The entry widens to a 24 -foot parking aisle <br />inside the parking garage, see Figure 6. It should be noted that the parking garage is <br />existing. The only modification is a project feature that will install the gate at the face of <br />the parking garage. Driveway 1 is projected to have 3 AM and 6 PM peak hour trips. The <br />distance between the prolongation of the near curb along Cabrillo Park Drive and the gate <br />is approximately 317 feet. <br />Entry 2 is located off of the eastern fire lane approximately 260 feet north of East 1st Street. <br />The gate is located approximately 38 feet inside the parking garage and is 24 feet wide that <br />provides one 12 -foot inbound lane and one 12 -foot outbound lane, see Figure 7. The parking <br />garage is existing and the only modification is a project feature that will install the gate <br />inside the garage. Driveway 2 is projected to have 16 AM and 48 PM peak hour trips. The <br />distance between the prolongation of the near curb along East 18t Street is approximately <br />290 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.