My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-050 - Addendum to the Final Environment Imapct Report No. 2006-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2013
>
2013-050 - Addendum to the Final Environment Imapct Report No. 2006-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2013 9:30:51 AM
Creation date
11/6/2013 9:25:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2013-050
Date
10/21/2013
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
significantly fewer peak hour and daily trips being generated by the proposed <br />project than were previously analyzed with the underlying approved project. <br />rV. SITE ACCESS AND CIRCULATION <br />The operational characteristics and design features of the proposed site access on <br />First Street will be evaluated based on the projected inbound and outbound volumes <br />at the driveway. The on -site circulation will be examined to ensure that there is <br />adequate maneuvering area available for residents and visitors to access the parking <br />structure. A gate stacking analysis will be conducted for the gated entries using the <br />County of Orange Environmental Management Agency (EMA) Standard Plan No. <br />1107 to determine the vehicle stacking requirements for the proposed project. <br />VII. REQUIRED MITIGATION MEASURES AND /OR RECOMMENDATIONS <br />VIII. <br />Based upon the results of the Traffic Analysis physical, operational improvements, <br />and/or identifying fair share costs required in order to mitigate any potentially <br />adverse Project impacts will be identified in the Traffic Analysis. <br />A summary of the results of the Traffic Analysis and recommended improvements, if <br />any, will be provided. <br />PAI 14316(1)-FiratStr tApts0 70 12013- TralEcAnalysis3copeanisc.pkp <br />Approved: <br />Date: Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.