Laserfiche WebLink
t�� t Environmental <br />Checklist <br />CEQA Compliance <br />Less Than <br />Issues & Supporting Information Sources <br />Potentially <br />Significant <br />Significant with <br />Mitigation <br />Less Than <br />Significant <br />Impact <br />incorporated <br />Impact <br />No Impact <br />B. <br />Exceed, either individually or cumulatively, a level of <br />service standard established by the county congestion <br />❑ <br />❑ <br />❑ <br />management agency for designated roads or highways? <br />C. <br />Result in a change in air traffic patterns, including either <br />an increase in traffic levels or a change in location that <br />❑ <br />❑ <br />❑ <br />results in substantial safety risks? <br />D. <br />Substantially increase hazards to a design feature (e.g., <br />sharp curves or dangerous intersections) or <br />❑ <br />❑ <br />❑ <br />incompatible uses (e.g., fain equipment)? <br />E. <br />Result in inadequate emergency access? <br />❑ <br />❑ <br />❑ <br />F. <br />Result in inadequate parking capacity? <br />❑ <br />❑ <br />❑ <br />G. <br />Conflict with adopted policies supporting alternative <br />❑ <br />❑ <br />❑ <br />transportation (e.g., bus turnouts, bicycle racks)? <br />XVI. Utilities and Service Systems <br />A. <br />Exceed wastewater treatment requirements of the <br />❑ <br />❑ <br />❑ <br />applicable Regional Water Quality Control Board? <br />B. <br />Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />❑ <br />❑ <br />❑ <br />facilities, the construction of which could cause <br />significant environmental effects? <br />C. <br />Require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, <br />❑ <br />❑ <br />❑ <br />the construction of which could cause significant <br />environmental effects? <br />D. <br />Are sufficient water supplies available to serve the <br />❑ <br />❑ <br />❑ <br />project from existing entitlements and resources or are <br />new or expanded entitlements needed? <br />E. <br />Result in the determination by the wastewater <br />treatment provider which serves or may serve the <br />❑ <br />❑ <br />project that it has adequate capacity to serve the <br />❑ <br />project's <br />projected demand in addition to the <br />provider's existing commitments? <br />F. <br />Is the project served by a landfill with sufficient <br />❑ <br />❑ <br />❑ <br />permitted capacity to accommodate the project's sold <br />Page 11 <br />