I. Introduction and Summary <br />This Addendum is to the Final Environmental Impact Report (EIR) that was certified on March 19, <br />2007 (Resolution 2007 -26, Environmental Impact Report (State Clearinghouse #2006031041) and <br />Mitigation Monitoring Plan ( "MNIP ")) for The Metro East Nfixed Use Overlay Zone and First and <br />Cabrillo Towers project (Project) and analyzes the potential environmental effects of a less intense <br />development for the same site between the approved Project and the proposed 1901 E. First Street <br />project (Proposed Project). <br />The proposed 1901 East First Street project proposes the development of 343,675 square feet of <br />residential use (254 units) and 2,424 square feet of retail space on a 5.1 acre site at the northeast <br />corner of First Street and Cabrillo Park Drive. An existing 4 level parking structure with 664 <br />existing parking spaces will be incorporated into the project. The project proposes to construct two <br />five -story low -rise buildings totaling 240 units on the west side of the existing 4 level parking <br />structure. Fourteen three -story townhomes will be constructed along the south and east sides of the <br />parking structure. A 5,000 square foot club house and recreation deck with a swimming pool will be <br />constructed over the southern half of the existing parking structure that will eliminate approximately <br />137 of the existing spaces in the parking structure. Other recreational amenities that are proposed <br />for the recreation deck on the parking structure include a spa, fitness center, billiards and game <br />room, outdoor fireplaces, berbeques, etc. Once completed, the project will provide a total of 555 <br />parking spaces, including 527 spaces in the existing parking structure and 28 surface parking spaces <br />throughout the site. The proposed site plan is shown in Figure 1. <br />Project Background <br />The City approved the First and Cabrillo Towers project along with the Metro East Overlay Zone <br />on March 19, 2007. The Metro East Overlay Zone FIR includes an area over 200 acres and includes <br />the 5.1 acre First and Cabrillo Towers project site. The First and Cabrillo Towers project is <br />approved for the development of up to 435,000 square feet of residential areas in a 22 -stoty and 23- <br />story building, approximately 8,900 square feet of retail /commercial areas, and approximately 774 <br />parking spaces, 661 of which are located in an existing garage. <br />The Proposed Project, as described in this Addendum, involves the proposed development of a less <br />intense project on the same site as the approved First and the Cabrillo Towers project. The <br />Proposed Project does not result in any new potentially significant environmental impacts or cause a <br />substantial increase in the severity of the impacts that were identified in the Final EIR that was <br />certified March 19, 2007 and no substantial circumstances under which the Project is undertaken <br />have occurred. Thus, this Addendum to the certified Final F.IR on March 19, 2007 is appropriate <br />Pursuant to the provisions of the California Environmental Quality Act, Public Resources Code <br />section 21000, el Seel. (CLQA), and 14 Cal. Code Regulations, section 15000, e/ Seel. (CEQA <br />Guidelines). <br />II. Purpose of an Addendum <br />Pursuant to the CEQA Guidelines, a lead agency is required to determine whether its discretionary <br />approvals have the potential to result in significant environmental impacts. In the case of the <br />1901 East First Street — Addendum Page I <br />August 14, 2013 <br />