My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-050 - Addendum to the Final Environment Imapct Report No. 2006-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2013
>
2013-050 - Addendum to the Final Environment Imapct Report No. 2006-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2013 9:30:51 AM
Creation date
11/6/2013 9:25:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2013-050
Date
10/21/2013
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Project, the City of Santa Ana (City) is the lead agency and prepared and adopted the Final <br />EIR for the Project on March 19, 2007. <br />As the Proposed Project is a reduced development compared to the Project (96,687 square feet of <br />residential and 6,476 square feet of retail less), the City must review the Proposed Project and the <br />approved Project in accordance with Sections 15162 and 15164 of the CEQA Guidelines. <br />CEQA Guidelines §15162 <br />(a) When an EIR has been certified or a negative declaration adopted for a project, no subsequent <br />EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial <br />evidence in the light of the whole record, one or more of the following: <br />(1) Substantial changes are proposed in the project which will require major revisions of the <br />Previous EIR or negative declaration due to the involvement of new significant environmental <br />effects or a substantial increase in the severity of previously identified significant effects; <br />(2) Substantial changes occur with respect to the circumstances under which the project is being <br />undertaken which will require major revisions of the previous EIR or negative declaration due to <br />the involvement of new significant environmental effects or a substantial increase in the severity <br />of previously identified significant effects; <br />(3) New information of substantial importance, which was not known and could not have been <br />known with the exercise of reasonable diligence at the time the previous EIR or negative <br />declaration was certified as complete or the negative declaration was adopted shows any of the <br />following: <br />(A) The project will have one or more significant effects not discussed in the previous EIR or <br />negative declaration; <br />(B) Significant effects previously examined will be substantially more severe than shown in the <br />previous RIR; <br />(C) Mitigation measures or alternatives previously found not to be feasible would in fact be <br />feasible and would substantially reduce one or more significant effects, but the project <br />proponents decline to adopt the mitigation measure or alternative; or <br />(D) Mitigation measures or alternatives which are considerably different from those analyzed in <br />the EIR would substantially reduce one or more significant effects on the environment, but <br />the project proponents decline to adopt the mitigation measures or alternatives (Pub. Res. <br />Code §21166; CEQA Guidelines §15162. <br />Given that none of the conditions requiring preparation of a Subsequent EIR (CEQA Guidelines <br />§15162) are present and only special study upgrades to the previous EIR are necessary to reflect the <br />development proposed for the site, an [Addendum to the previously adopted Final Environmental <br />Impact Report is proper and complies with CEQA Guidelines §15164. CEQA Guidelines 515164(x) <br />states, "The lead agency or responsible agency shall prepare an addendum to a previously certified <br />EIR if some changes or additions are necessary but none of the conditions described in Section <br />15162 calling for preparation of a subsequent EIR have occurred." In the case of the proposed <br />project, none of the conditions in Section 15162 calling for the preparation of a subsequent EIR <br />have occurred. Therefore, the City exercises the right to prepare all Addendum in this case and not <br />a subsequent EIR. <br />1901 East First Street — Addendum <br />Page 3 <br />August 14, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.