Laserfiche WebLink
June 17, 2013 <br />Page 6 <br />(3) Remodel crew bathroom <br />Justification: (I) The station is 47 years old. fire fighters are housed in a single dormitory <br />rooin that is inappropriate for mixed gentler assignment. Crew (toes not <br />have adequate facility to store clothing and personal items. The corm-non <br />steeping arrangement provides noprivacy and makes quality rest difficult. <br />Installation of privacy cubicles with doors and uniform lockers will bring <br />the space into compliance with OCPA habitability standards and <br />facilitate mixed gender use. General improvement of the space attending <br />the cubicles will improve the quality of life for the crew, <br />Scope of <br />Work: <br />(2) The station kitchen has exceeded reasonable service life, All kitchen <br />systems are old, many broken and difficult to maintain in safes sanitary; <br />serviceable conditions. The space does not support the need of station <br />personnel and does not meet OCI'A standards for crew kitchens. The <br />attached photographs- illustrate the problematic issues. <br />(3) The crew bathroom has exceeded reasonable service life. All systems <br />and fixtures are old, marginally serviceable and difficult to maintain in <br />safe, sanitary, serviceable condition. The attached photographs illustrate <br />the trroblem. <br />(1) Demolition afthe currcut irtterlor space andinstaltation of new flooring, <br />replacement of overhead lighting, new window covering, procurement <br />and installation of pro- fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker, paint and <br />finish. <br />(2) Demolition of the existing kitchen space. Procurement and installation of <br />new flooring, lighting systems, tower and upper cabinets, installation of <br />SS counter system with integral single large sink and disposal systems, <br />replacement of faucets and fixtures, upgrade of electrical, replacement of <br />dishwasher, range with ventilation and rehigerators, painting and finish. <br />(3) Demolition of existing bathroom, hustallation of new flooring, overhead <br />lighting, exhaust ventilation, cabinets, shelving, Counter, sink, and <br />fixtures. Replacement of privacy showers and fixtures and painting and <br />finish. <br />25A -22 <br />