My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:02:50 AM
Creation date
11/15/2013 6:53:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25A
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 16 <br />(2) Remodel kitchen <br />(3) Remodel crew bathroom <br />Justificadon: The station is 33 years old, <br />station side of the building. <br />that is inappropriate for r <br />cubicles with doors and tin <br />with OCFtX standards, <br />The improvements described are limited to the fire <br />Firefighters are housed in a single dormitory roottt <br />nixed gender assignment. Installation of privacy <br />form lockers will bring the space into compliance <br />The station kitchen has exceeded its reasonable service life, ILitchen systems are <br />old, broken and difficult to keep sanitary, safe and serviceable. It no longer <br />meets the need of station personnel and does not meet 0CFA standards for a <br />crew kitchen, Photos attached. <br />The crew bathroom has exceeded reasonable service life and is Inappropriate for <br />nnix gender assignment. Photos attached. <br />Scope of (1) Demolition ofcurrent interior space and installation ofnew <br />Work: flooring, replacement t f overhead lighting, new window coven ng, <br />procurement and installation of pre - fabricated cubicles with <br />privacy door, procurement and installation of uniform and <br />equipment locker, <br />(2) Demolition of existing kitchen space. Procurement and installation of <br />new flooring, lighting systems, lower and upper cabinets, Installation <br />Of SS counter system with integral single large sink and disposal <br />systems, replacement of faucets and fixtures, upgrade of electrical, <br />replacementt of dishwasher, rauge with ventilation and refrigerators, <br />painting and finish, <br />(3) Demolition of existing space. Procurement and installation of <br />replacement flooring, overhead lighting, exhaust ventilation, <br />cabinets, shelving, counter, sink, and fixtures. Installation of privacy <br />showers and fixtures, painting and finish. <br />See photos an the next page. <br />25A -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.