My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:02:50 AM
Creation date
11/15/2013 6:53:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25A
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 26 <br />(3) Remodel crew bathroom <br />Justification: M The station is 33 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignanent. Installation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />compliance with OCFA habitability standards. <br />(2) The station roof is original, Over thirty years old, it is in poor condition. <br />It fails continuously and cannot be economically repaired. <br />(3) The crew bathroom has exceeded reasonable service lire and i, <br />Scope of (1) Demolition of current interior space and installation of new flooring; <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre - fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker, <br />(2) Demo I ition/tear-off of the existing gravel built-up roof and replacement <br />of 6,400 square feet of modified bitumen roof, <br />(3) Demolition of existing space. Procurement and installation or <br />replacement flooring, overhead lighting, exhaust ventilation, cabinets, <br />shelving, counter, sink, and fixtures. Replacement showers and fixtures <br />and painting and finish as required, <br />See photos on the next page. <br />25A-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.