My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:02:50 AM
Creation date
11/15/2013 6:53:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25A
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 31 <br />(3) Replace Roof <br />Justificatiow (1) The station is 54 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Installation of <br />privacy cubicles with doors and uniform lockers will bring the spice into <br />compliance with OCFA habitability standards, <br />(2) The current flooring is a mix of original and added carpet, The entire <br />interior is beyond serviceability and requires replacement. <br />(3) The station roof is a replacement foam roof system approaching the end <br />Of its serviceable life, It fails frequently. Continued repair will not <br />provide added life, <br />Scope of (1) Demolition of current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre-fabricated cubicles with privacy door, <br />Procurement and installation of uniform and equipment locker, <br />(2) Demolition/rernoval, of all current floor covering, repair of flooring base <br />and installation Of 18X18 composite vinyl tile, trim, base molding, finish <br />and paint as required, <br />(3) Demolition tear- -off of existing, roof, repair as required, and addition of a <br />cricket drain and application of a buildup modified biturnen roof system. <br />Finish as required and installation. <br />See photos on the next page, <br />25A-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.