My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
25A - AGMT - FIRE STATION CAPITAL IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:02:50 AM
Creation date
11/15/2013 6:53:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25A
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 34 <br />(2) Remodel crew bathroom <br />(3) Replace roof <br />Justification: (1) The station is 33 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Installation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />COMPI inucc with OCFA habitability standards, <br />(2) The crew bathroom has exceeded service life and is inappropriate for mix <br />gender use. See attached photographs, <br />(3) The existing roof is more than 25 years old and has reached serviceable <br />life. It fails continuously and is not economical to repair, Frequent <br />leak/failure risks damage to internal building structures and spaces, <br />il'1�1�11-11-11 —, 11-1- 1 - 11 <br />Scope of (1) Demolition ofeurrent interior space and installation of now flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre-fabricated cubicles with privacy I door, <br />Procurement and installation of uniform and equipment locker. <br />(2) Demolition of existing space, Installation of replacement flooring, <br />overhead lighting, exhaust ventilation, cabinets, shelving, counter, sink, <br />and flxturo& Replacement showers and fixtures and painting and finish <br />as required. <br />(3) Demoli(ion/tear-off of the existing shingle roof, substrate repair as <br />required raidreplacementAid, a modified bitumen roofsystem finish as <br />required, <br />see photos oil tile next page. <br />25A-50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.