My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP INTEGRATED SOFTWARE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
19C - RFP INTEGRATED SOFTWARE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:31:12 AM
Creation date
11/15/2013 7:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
19C
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAPD Integrated Law Enforcement Solution RFP <br />Chapter 2: Vendor Response <br />Attached? Y/N <br />12. Describe how the proposed system is in compliance with current CJIS and <br />standard security practices, including a description of how the solution encrypts <br />data transmissions (particularly NCIC). <br />Attached? Y/N <br />13. The City prefers that the Offeror comply with the City's security procedures <br />when accessing the system, which include the use of individual user accounts <br />instead of generic role accounts, obtaining access authorization for each access <br />instance, using Virtual Private Networking (VPN) where applicable, and not <br />sharing passwords or other access information. Please explain how you plan on <br />supporting and maintaining the system while meeting these preferences? <br />Attached? Y/N <br />14. The City prefers that three system environments be established prior to cutover to <br />live production: testing, training, and production. The testing environment will be <br />used to test new versions, new data, and alternative configurations of the system <br />both during implementation (e.g., for Functional Acceptance Tests) and post <br />cutover to live operations. The system's training environment will also be used <br />both during implementation (e.g., to train system users) and post cutover to live <br />operations. The system's production environment must be fully tested and ready <br />prior to cutover to live operations of the system and will be used as the main <br />operational environment for the system. The three environments should be <br />independent of each other meaning that transactions occurring in one <br />environment will not impact or modify data contained in the other environments <br />nor impact their performance (i.e., system response times and system <br />availability). Please fully describe the equipment and software contained in each <br />environment, when each environment will be frilly operational, and how system <br />users and administrators will be able to access each of these environments. <br />Attached? Y/N <br />15. Please describe in detail the process of initially installing the system's client <br />applications on PC and mobile workstations, including all manually performed <br />procedures (i.e., staff having to install or configure system components manually <br />on each PC hosting the client applications. <br />Attached? Y/N <br />19C -29 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.