My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP INTEGRATED SOFTWARE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
19C - RFP INTEGRATED SOFTWARE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 7:31:12 AM
Creation date
11/15/2013 7:18:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
19C
Date
11/18/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAPD Integrated Law Enforcement Solution RFP <br />Chapter 2: Vendor Response <br />Computer Hardware <br />Although a complete "turnkey" system server configuration is required, the City retains the <br />right (i.e., option) to purchase any of the equipment, operating system software, databases, <br />and third party software included in the Offeror's response to this RFP directly from City <br />sources. Should the City exercise its option to purchase any of the equipment, operating <br />system software, databases, and third party software included in the Offeror's response, it <br />will purchase only equipment and software meeting the Offeror's specifications. Please <br />identify and describe any impacts in terms of support or costs stemming from the City <br />exercising this option. <br />Attached? Y/N <br />1. Server Equipment Requirements <br />Please provide the minimum required hardware configurations for each system <br />component that will function as a server (e.g., application server, database server, <br />file /print server, message switch). <br />a. System Information <br />(1) Vendor <br />(2) Model <br />b. CPU <br />(1) Type (Current/Projected) <br />(2) Speed (Current /Projected) <br />c. # CPU's <br />(1) Minimum Required (Current/Projected) <br />(2) Recommended (Current/Projected) <br />d. Memory <br />(1) Minimum Required (Current/Projected) <br />(2) Recommended (Current /Projected) <br />e. Disk space capacity4 <br />(1) Minimum Required (Current /Projected) <br />(2) Recommended (Current/Projected) <br />f. Disk Array Configuration Proposed? Y/N <br />(1) RAID Level(s) supported <br />Retaining at least 36 months of detailed incident data for CAD servers. <br />19C -34 2.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.