My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 1901 East First St
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/18/2013
>
75A - PH 1901 East First St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 9:26:31 AM
Creation date
11/15/2013 9:01:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/18/2013
Destruction Year
2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Any concerns between monitors and construction personnel shall be addressed by the City of Santa Ana, <br />Planning Department, <br />4.4 LIST OF MITIGATION MEASURES <br />As mentioned above, due to the program- and project -level components of this EIR, the MMP has been <br />divided into two parts to address each component separately. The mitigation measures that pertain to <br />implementation of the Overlay Zone and their method of implementation are fisted in Table 4 -1. The <br />mitigation measures, which include several m dgadon measures from the ptogram -level component, that <br />pertain to the First and Cabrillo Towers project are listed in Table 4 -2. All project- specific mitigation <br />measures included in the Final EIR for this project would be monitored as described above. <br />The mitigation monitoring matrix on the following pages is formatted to parallel the format of the <br />Executive Summary table contained in the Final EIR. The matrix identifies the required mitigation <br />measures, the time frame for monitoring, and the responsible monitoring agencies. <br />It should be noted that the mitigation measures from Volume I that are contained within Table 4 -2 have <br />been modified slightly so as to directly apply to the First and Cabrillo Towers project. Tic content and <br />action required by each mitigation measure have not been modified. <br />4-2 City of Santa Ma <br />754ofZO2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.