My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-055 - Tentative Tract Map No. 2013-04
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2013
>
2013-055 - Tentative Tract Map No. 2013-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 1:35:07 PM
Creation date
11/26/2013 11:29:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2013-055
Date
11/18/2013
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUST 26, 2013 <br />PAGE 4OF5 <br />20. Pedestrian walkways shall be provided through the project. The amenities <br />to be provided along this pathway shall include decorative concrete and <br />paving, accent lighting, and landscape planters. The materials and design <br />of the walkway is subject to the review and approval of the Planning <br />Division. <br />21. A Resident Storage Plan shall be provided for the project. Storage shall be <br />available at no cost to the residents. <br />22. Cast iron drain pipes shall be provided for the project. <br />23. Smart wiring, including cable television and high -speed cable for computers, <br />shall be provided for each unit and within the project's common areas. <br />24. Construction workers for the project shall be prohibited from parking in the <br />adjacent neighborhoods. <br />25. Prior to occupancy of any units, a rental housing execution plan must be <br />submitted to the Planning Division for review and approval. At a minimum, <br />the plan shall identify the location of employee and visitor parking, the <br />location of the rental office, hours of operation for the rental office, and <br />signage affiliated with the Rental Housing Operational Plan. In addition, the <br />rental plan must clearly note that the parking and project amenities must be <br />provided free of charge to the residence. <br />26. Prior to submittal into building plan check, the design for the courtyard gates <br />shall be submitted to the Planning Division for approval. The fences /gates <br />shall be decorative and ornamental in nature as they are the entries to the <br />interior courtyards. <br />27. The following best management practices (BMPs) need to be incorporated <br />into the project construction and operation to minimize greenhouse gas <br />impacts: <br />a. Install energy efficient lighting, appliances, heating, and cooling <br />systems. <br />b. Install efficient lighting for street and other outdoor lighting. <br />C. Reduce unnecessary outdoor lighting. <br />d. Provide education on energy efficiency to residents and /or tenants. <br />e. Install water - efficient irrigations systems and devices. <br />Resolution No. 2013 -055 <br />Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.