My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR BRISTOL ST WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/02/2013
>
55B - RESO - EIR BRISTOL ST WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:49:34 AM
Creation date
12/2/2013 9:57:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
12/2/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17" Street <br />1.3 Project Background <br />1.3.1 Approved 1990 Final EIR/E/S <br />The City of Santa Ana General Plan designates Bristol Street as a Major Arterial Highway traveling in a <br />north -south direction. As a result of significant growth and traffic congestion on Bristol Street, the City of <br />Santa Ana, in the late 1980s, proposed to widen Bristol Street from a four -lane roadway to a six -lane <br />arterial in accordance with adopted County of Orange and City of Santa Ana standards for a Major <br />Arterial Highway. A joint EIS/EIR was prepared and approved by the City of Santa Ana and the <br />California Department of Transportation (Caltrans) for the widening of Bristol Street in 1990. The 1990 <br />Project entailed a 3.9 -mile segment of Bristol Street from Warner Avenue to Memory Lane. Due to <br />significant costs associated with construction and availability of funding, the street widening Project was <br />divided into three phases; Phase I, from Warner Avenue north to First Street; Phase II, consisting of the <br />widening and reconstruction of the bridge which crosses Santiago Creek (northerly limits of the street <br />widening Project); and Phase III, between First Street and Memory Lane. Subsequently, and also due to <br />funding programming and availability, the Phase III segment has been further divided into two separate <br />segments: Phase IIIA, Civic Center Drive to Washington Avenue; and Phase IIIB (the subject of this <br />Addendum), Washington Avenue to 176' Street. The Bristol Street widening segments, as described <br />above, operate independently; that is, operation of one segment is not dependent on another. <br />The 1990 FEIS /EIR (SCH No. 87071509) was approved on November 19, 1990. The 1990 FEIS /EIR and <br />associated technical studies, incorporated herein by reference, documented the environmental impacts of <br />widening Bristol Street from Warner Avenue to Memory Lane in the City of Santa Ana. As stated in the <br />1990 FEIS/EIR, the purpose and goals of the Bristol Street Widening Project were to: <br />1. Provide sufficient roadway capacity to accommodate current and future traffic demand. <br />2. Improve the performance and safety of the roadway for the benefit of the motoring public. <br />3. To reduce current and projected future delays experienced at major intersections and to design <br />intersections to function at acceptable Levels of Service (LOS). <br />4. To design the roadway in manner conducive to the provision of public transportation, namely bus <br />service provided by the Orange County Transit District (OCTD). <br />1.3.2 Adopted Transportation Improvement Program <br />The Bristol Street Widening Project is fully funded and included in the Southern California Association <br />of Government's (SCAG's) 2012 Regional Transportation Plan titled 2012 -2035 Regional Transportation <br />Plan/Sustainable Communities Strategy (RTPISCS): Towards a Sustainable Future (2012 RTP) (RTP ID <br />ORA125). The project is also currently listed in SCAG's financially constrained 2013 Federal <br />Transportation Improvement Program (2013 FTIP) for fiscal year 2012/2013 — 2015/2016. The project <br />entry in the 2013 FTIP identifies the following scope of work BRISTOL ST (WARNER TO MEMORY LANE) <br />WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOUWARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND <br />BRISTOURRST (ADD NBISB THRU LNS; SB LFTIRTITRN LNS). <br />ANA 111 -334 (PER- 02 -0t) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 8 <br />55B -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.