My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR BRISTOL ST WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/02/2013
>
55B - RESO - EIR BRISTOL ST WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:49:34 AM
Creation date
12/2/2013 9:57:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
12/2/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 171" Street <br />1.4.3 Changes as Compared to the Approved Project <br />It should be noted that Project phasing has been revised from the original three phases identified in the <br />1990 FEIS /EIR. Construction phasing of the entire Project segment has been further subdivided as <br />follows: <br />• St. Andrew Place to McFadden Avenue (Constructed in 2002) <br />• Elm Street to Memory Lane (Constructed in 2003) <br />• Pine Street to 3'a Street (Constructed in 2009) <br />• Phase I: McFadden Avenue to Pine Street (Constructed in 2011)' <br />• Phase II: 3`a Street to Civic Center Drive (Under construction to be completed in 2014) <br />• Phase IIIA: Civic Center Drive to Washington Avenue <br />• Phase IIIB: Washington Avenue to 176' Street <br />• Phase IV: Warner Avenue to St. Andrew Place <br />• Phase V: 17 "' Street to Elm Street <br />The proposed street widening design configuration for the current Phase IIIB segment (proposed Project <br />addressed herein) differs from the original configuration of the 1990 FEIS /EIR, as follows: <br />• The proposed Project eliminates the dedicated eastbound right -tam lane and proposes a shared <br />right -turn lane in its place at the intersection of Bristol Street and 176' Street. <br />• The 1990 FEIS /EIR, using decommissioned noise methodology, recommended noise barriers <br />(soundwalls) at all easterly parcel boundaries currently fronting the east side of Bristol Street <br />between Civic Center Drive and 1701 Street. However, and using current noise modeling <br />methodology (URS Corporation, 2012c), noise abatement in the form of noise barriers is not <br />required for the proposed Project. <br />• For purposes of aesthetic treatment and enhancement, the proposed Project would install an <br />approximately 8 -foot high block wall at approximately the same location where the soundwall <br />was previously recommended (as addressed in the 1990 FEIS /EIR). <br />' Phase numbers were assigned to the Bristol Street Widening Project subsequent to caneelation of the CenterLine Light Rail <br />Transit Project and associated reallocation of funding from that canceled project to the Bristol Street Widening Project, <br />ANA 11I -334 (PER- 02 -01) CITY OF SANTA ANA (11 /25/2013 REV2) 132897 CM PACE 12 <br />55B -19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.