My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR BRISTOL ST WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/02/2013
>
55B - RESO - EIR BRISTOL ST WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:49:34 AM
Creation date
12/2/2013 9:57:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
12/2/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17`b Street <br />b.) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, <br />and historic buildings within a state scenic highway? <br />There are no state - designated scenic highways within the Project area, nor is the Project area visible from <br />any scenic highways. No impacts are anticipated in this regard. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />c.) Substantially degrade the existing visual character or quality of the site and its surroundings? <br />The proposed Project is located in a highly urbanized area of the City of Santa Ana. Although the <br />proposed Project would result in modifications to the visual character of the area resulting from the <br />widening of Bristol Street and resultant property acquisitions, as well as the addition of an 8 -foot high <br />block wall at approximately the same location where the soundwall was previously addressed in the 1990 <br />FEIS/EIR, the Project would not result in substantial changes in visual character as analyzed in the 1990 <br />FEIS /EIR. Implementation of mitigation measures as included in the previously approved 1990 <br />FEIS /EIR, including installation of a block wall as described above, would ensure that impacts are <br />reduced to a less than significant level. <br />Although the proposed block wall is no longer warranted for purposes of noise abatement based on the <br />updated Project noise analysis (URS Corporation, 2012c), the wall, as further described in the 1990 <br />FEIS /EIR, was taken into consideration as a Project - related component in the context of providing <br />improved visual continuity within the Bristol Street corridor; not constructing the proposed block wall <br />would detract from providing an aesthetically unified streetscape along the Project corridor. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />d.) Create a new source of substantial light or glare that would adversely affect day or nighttime <br />views in the area? <br />Light and glare are currently generated from various sources within the Project area (e.g., commercial and <br />retail businesses, signage, street lighting, and parking lot lighting). The proposed Project does not involve <br />the construction of any structures other than relocation of street lighting fixtures. Therefore, no new <br />sources of light or glare are anticipated with implementation of the proposed Project. The proposed <br />Project would not generate additional daytime or nighttime illumination beyond that currently <br />experienced within the area. Implementation of the proposed Project would not create more significant <br />light and glare impacts than previously analyzed in the 1990 FEIS /EIR. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (11/25/203 REV2) 132897 CM PAGE 19 <br />55B -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.