My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR BRISTOL ST WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/02/2013
>
55B - RESO - EIR BRISTOL ST WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 10:49:34 AM
Creation date
12/2/2013 9:57:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
12/2/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIS — Washington Avenue to 17'" Street <br />Construction Permit for stormwater discharges from construction sites ( NPDES No. CAS000002; Order <br />No. 2009 - 2009 -DWQ, amended as Order No. 2012 - 0006 -DWQ). Under this General Construction <br />Permit, discharges of stormwater from construction sites with a disturbed area of one or more acres are <br />required to either obtain individual NPDES permits for stormwater discharges or to be covered by the <br />General Construction Permit. In addition, BMPs specified in the Caltrans Storm Water Management Plan <br />are also applicable. The construction contractor is required to conform to the requirements of the General <br />NPDES Permit for Construction Activities and any subsequent General Permit in effect at the time of <br />Project construction. <br />As part of the statewide NPDES permit, the construction contractor would be required to implement <br />BMPs into their construction operations to reduce potential water quality impacts to the maximum extent <br />practicable through preparation of a SWPPP. The General Construction Permit contains requirements that <br />BMPs must meet, including: <br />Erosion Control <br />Erosion control, also called stabilization, is the protection of the soil surface so that soil particles do <br />not become detached by water or wind; and trapping soil particles that do become detached and are <br />moved by water or wind. <br />Non - Stormwater Management <br />Non - stormwater management is the reduction or avoidance of discharges other than stornwater, such <br />as from cleaning of vehicles and equipment, and spills of hazardous materials and hazardous wastes. <br />Non - stormwater management includes requirements for the use and storage of hazardous substances <br />so as to avoid spills and minimizes pollution by cleaning spills that do occur. <br />The SWPPP contains BMPs chosen for a project based on the specific activities that would be <br />conducted as part of that project, and the amounts of stormwater and non - stormwater runoff that are <br />anticipated, and the projected Risk Level. The 1990 FEIS /EIR included a mitigation measure to <br />control stormwater runoff associated with construction activities. Impacts would be less than <br />significant and would be similar to those identified in the 1990 FEIS/EIR. Moreover, the Project <br />would comply with the updated NPDES requirements, as described above. <br />Operational Phase <br />Vehicular travel along the improved Project corridor has the potential to degrade water quality, <br />including increases in such pollutants as oil, gasoline, grease, lead, and dust. Discharge from the <br />Project site to stormwater facilities would consist of non -point sources. Stormwater quality is <br />generally affected by the length of time since the last rainfall, rainfall intensity, urban uses of the area, <br />and the quantity of transported sediments. Typical urban water quality pollutants usually result from <br />motor vehicle operations, oil and grease residue. The majority of pollutant loads are usually washed <br />away during the first flush of the storm occurring after the dry season period. Due to the nature of the <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 38 <br />55B -45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.