Laserfiche WebLink
DRAFT (August 7, 1990) <br />9. ne proposed project shall comply with city standards described in the General Plan <br />as they apply to buildings and parking structures located in a tloodplain. <br />Timing of lmnleplzntationlVerifieation: Prior to grading permit issuance <br />Method of Vttification: Written evidence provided by applicant <br />Ree,pongib]e Parties: Sr. Plan Check Engineer, Building Division <br />& Manager, Engineering Services <br />kY.r1Ur;.TM* i s <br />NOISE <br />30. All construction activities shall be limited to the hours of 7:00 a.m. to 8:00 p.m., <br />Monday through Saturday. No construction shall be permitted on Sundays or federal <br />holidays. <br />Timing-pf 1mplementation(Verif cation: Prior to grading permit issuance <br />Method of Verification: Grading plan check and field inspection <br />Responsible Parties: Sr. Plan Check Engineer, Building Division <br />Verification (Name & Date): <br />11. Where appropriate, construction equipment shall be muffled to reduce construction <br />noise impacts. <br />Timing of Prior to grading permit issuance <br />Method of Verification: Grading plan check, written verification <br />provided by appliant, and field inspection <br />Responsible Parties: Sr. Plan Check Engineer, Building Division <br />Verification Wsme & Date): <br />4 <br />. 773 <br />