Laserfiche WebLink
NOVEMBER 25, 2013 <br />PAGE 2 OF 2 <br />8. Provide details of the mailbox or "gang box" to be installed. Such box shall be <br />enclosed in a decorative pedestal to match architecturally with the proposed <br />buildings. <br />9. Paving at each driveway shall match the proposed walkway paving finish. <br />10. All utility meters and boxes shall be placed in vaults below grade. Any above grade <br />meter and /or box shall be reviewed by the Planning Division Manager to ensure all <br />options have been reviewed. <br />11. Solar panels shall be provided for each of the 17 homes. The final design and <br />application of the panels shall be subject to the review and approval by staff. <br />32A -44 <br />