Laserfiche WebLink
EXHIBIT D <br />Additional Offsite Mitigation Measures <br />Improvement <br />Location <br />Pay fair share of all costs to acquire <br />required right of way for and construct <br />Fourth Street at Southbound SR -55 on- <br />eastbound right turn lane <br />ramp (Tustin Avenue to SR -55) <br />In order to implement & satisfy mitigation <br />measure MM 4.12 2, construct raised <br />First Street and Cabrillo along the <br />"pork- chop" island to Public Works <br />project frontage <br />Agency specifications <br />Note: For offsite public improvements constructed by Owner (i.e., "pork- chop" island), it <br />shall pay all workers employed in connection with the work not less than the prevailing <br />rates of wages, as provided in the statutes applicable to public works contracts, <br />including without limitation §§ 1770 -1780 of the California Labor Code. <br />0e7e19\5448832v5 Exhibit D -1 <br />