My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PD VIDEO MONITORING CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
01/21/2014
>
25B - AGMT - PD VIDEO MONITORING CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 2:58:01 PM
Creation date
1/16/2014 2:56:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25B
Date
1/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />• Zoom — Zoom in to see fine detail or zoom out to see the big picture. <br />• Rotation — Rotate any piece of content to any orientation. <br />• Transparency — Adjust the transparency of any piece of content from fully opaque to fully <br />transparent, great for doing visual overlays. <br />• Shading — Adjust the color shading of any object to expose new visual information or match <br />desired aesthetics. <br />• Cloning — Multiple copies of any content can be displayed simultaneously on multiple <br />locations on the wall. Each clone can be independently sized, positioned, rotated and colored. <br />Situation Wall <br />• Monitors: Siemens will provide nine (9) NEC X551LN 55" LED LCD Monitors displaying <br />at a resolution of 5760 x 3240. <br />• Video Matrix Hardware Controllers: Siemens will provide (9) eight Hiperwall video display <br />controller units that will be housed in each NEC X551UN monitor through an interal Open <br />Pluggable Specification (OSP) slot. <br />• The COP System will have content sharing capabilities at the following workstation <br />locations: Workstation VSS 01, Classroom F Laptop 01, Classroom F Laptop 02, Classroom <br />F Laptop 03, Classroom F Laptop 04, and video streaming through Workstation VSC 01. <br />• Network Requirements: The video switch will need nine (9) 10 /100 /1000 Gigabit Ethernet <br />Ports. <br />CC Workstation 01 <br />• Monitors: Siemens will provide one (1) 24" NEC LED LCD Monitor <br />• The Content Control workstation will be able to control how content will be displayed on the <br />Situation Wall from Workstation VSS 01, Classroom F Laptop 01, Classroom F Laptop 02, <br />Classroom F Laptop 03, Classroom F Laptop 04, and video streaming through Workstation <br />VSC 01. <br />• Network Requirements: The video switch will need one (1) 10/100/1000 Gigabit Ethernet to <br />the workstation. <br />VSS Workstation 01 <br />• Monitors: Siemens will provide three (6) 27" NEC LED LCD Monitors. <br />• The workstation will be shared with the following common operating picture video matrix <br />and video wall locations: Situation Wall, two (2) monitors in Station Supervisor office, two <br />(2) monitors in Watch Commander's Office and one (1) Monitor at Dispatch. <br />• COP System Software Installed: Hiperwall Sender Node (six (6) Simultaneous windows) <br />• Network Requirements: The video switch will need one (1) 10/100/1000 Gigabit Ethernet to <br />the workstation. <br />VSC Workstation 01 <br />• The Video Stream Capture workstation will be able to capture two (2) streaming video streams such <br />as an input from the satellite or local TV receiver. <br />• COP System Software Installed: Hiperwall Sender Node (two (2) simultaneous video <br />streams) <br />• Network Requirements: The Video will need one (1) 10 /100 /100 Gigabit Ethernet to the workstation. <br />Siemens Industry, Inc. <br />10775 Business Center Drive <br />Cypress, CA 90630 <br />25B -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.